HomeMy WebLinkAbout5812 •
•
19. Have two (2) complete sets of constructions drawings been submitted
with the application?
Yes No co Not necessary for this project (2)
20. Is this an application -for the placement of a manufactured home?
Yes No
If yes, have you specified the size of the unit (min. 20ft x 20ft); live
roof load (min.40 #); wind design (min. wind speed of 80 mph & 15 1b.
wind load); foundation design; method of anchoring?
Yes No ( 1 ) Not necessary for this project
21. Have you designed or had this plan designed while considering
building and other construction code requirements?
Yes No r"
22. Does the plan accurately indicate what you intend to construct and
what will receive a final inspection by the Garfield Building
Department? c , •
Yes No . (3)
23. Do you understand that approval for design and /or construction
chang are required prior to the application of these changes?
Yes No
24. Do you understand that the Building Department will collect a "Plan
Review" fee from you at the time of application and that you will be
required to pay the "Permit Fee" as well as any "School impact" or
"Septic system " fees required, at the time you pick up your building
permit?
Yes '-•-•• No
cn
25. Are you aware that you are required to call for all inspections required
under the Uniform Building Code including approval on a final
inspection prior to receiving a Certificate of Occupancy and
occupancy of the building?
Yes - -I=- No (3)
26. Are you aware that the person signing the Permit Application whether
the "Owner ", "Agent of the Owner ", "General Contractor ", "Contractor"
or otherwise, signing the application is the party responsible for the
project complying with the Uniform Codes ".
Yes r No (3)
(CONTINUED ON NEXT PAGE)
4