Loading...
HomeMy WebLinkAbout5812 • • 19. Have two (2) complete sets of constructions drawings been submitted with the application? Yes No co Not necessary for this project (2) 20. Is this an application -for the placement of a manufactured home? Yes No If yes, have you specified the size of the unit (min. 20ft x 20ft); live roof load (min.40 #); wind design (min. wind speed of 80 mph & 15 1b. wind load); foundation design; method of anchoring? Yes No ( 1 ) Not necessary for this project 21. Have you designed or had this plan designed while considering building and other construction code requirements? Yes No r" 22. Does the plan accurately indicate what you intend to construct and what will receive a final inspection by the Garfield Building Department? c , • Yes No . (3) 23. Do you understand that approval for design and /or construction chang are required prior to the application of these changes? Yes No 24. Do you understand that the Building Department will collect a "Plan Review" fee from you at the time of application and that you will be required to pay the "Permit Fee" as well as any "School impact" or "Septic system " fees required, at the time you pick up your building permit? Yes '-•-•• No cn 25. Are you aware that you are required to call for all inspections required under the Uniform Building Code including approval on a final inspection prior to receiving a Certificate of Occupancy and occupancy of the building? Yes - -I=- No (3) 26. Are you aware that the person signing the Permit Application whether the "Owner ", "Agent of the Owner ", "General Contractor ", "Contractor" or otherwise, signing the application is the party responsible for the project complying with the Uniform Codes ". Yes r No (3) (CONTINUED ON NEXT PAGE) 4