10. Does the building section drawing or other detail include the method
of positive connection of all columns and beams?
Yes ✓ No (1) Not necessary for this project (2)
11. Does the plan indicate the height of the building or proposed addition
from the highest point of the building or addition measured at mid
span betyveen the ridge and the eave down to existing grade contours?
Yes t/ No (I) Not necessary for this project (2)
12. Does the plan include any stove or zero clearance fireplace planned
for installation including make and model and Colorado Phase II
certifications or phase II EPA certification?
Yes ✓ No ( I ) Not necessary for this project (2)
13. Does the plan include a masonry fireplace including a fireplace
section indicating design to comply with the Uniform Building Code
Chapter 37?
Yes No ✓,) Not necessary for this project (2)
14. Does the plan include a window schedule or other verification that
egress /rescue windows from sleeping rooms and /or basements
comply with the requirements of the Uniform Building Code?
Yes ✓ No (i( Not necessary for this project (2)
15. Does the plan include a window schedule or other verification that
windows provide natural light and ventilation for all habitable rooms?
Yes ✓ No (i) Not necessary for this project ( 2 )
16. Do the plans indicate the location of glazing subject to human impact
such as glass doors, glazing immediately adjacent to such doors;
glazing adjacent to any surface normally used as a walking surface;
sliding glass doors; fixed glass panels; shower doors and tub
enclosures and specify safety glazing for these areas?
Yes ✓ No (1 Not necessary for this project (2)
17. Is the location of all natural and liquid petroleum gas furnaces, boilers
and water heaters indicated on the plan?
Yes __✓ No ( 1) Not necessary for this project (2)
18 Do you understand that if you belong to a homeowners association, it
is your responsibility to obtain written permission from that
association, if required by that association, prior to submitting an
applica�i6n for a building permit?
Yes ✓✓ No (I) Not necessary for this project (2)
3
•
•
•
•
19. Have two (2) complete sets of constructions drawings been submitted
with theapplication?
Yes ✓ No ( I ) Not necessary for this project (2)
20. Is this an application for the placement of a manufactured home?
Yes No _/
If yes, have you specified the size of the unit (min. 20ft x 20ft); live
roof load (min.40 #); wind design (min. wind speed of 80 mph & 15 lb.
wind load); foundation design; method of anchoring?
Yes No ()) Not necessary for this project (2)
21. Have you designed or had this plan designed while considering
building and other construction code requirements?
Yes No ✓ ( 3 )
22. Does the plan accurately indicate what you intend to construct and
what will receive a final inspection by the Garfield Building
Department?
Yes ✓ No (3)
23. Do you understand that approval for design and /or construction
changes are required prior w the application of these changes?
Yes ✓ No (3)
24. Do you understand that the Building Department will collect a "Plan
Review" fee from you at the time of application and that you will be
required to pay the "Permit Fee" as well as any "School impact" or
"Septic system " fees required, at the time you pick up your building
permit?
Yes ✓ No (3)
25. Are you aware that you are required to call for all inspections required
under the Uniform Building Code including approval on a final
inspection_prior to receiving a Certificate of Occupancy and
occupancy of the building?
Yes +/ No (,)
26. Are you aware that the person signing the Permit Application whether
the "Owner ", "Agent of the Owner ", "General Contractor ", "Contractor"
or otherwise, signing the application is the party responsible for the
project mplyirig with the Uniform Codes ".
Yes No (3)
(CONTINUED ON NEXT PAGE)
4
•
a0 0 0
..= }Q U JO in
�D ' ^ 7 0 • al a)
4?,' m N L7
.ti N Y•1
b (1) e.: V C
0 0 w V
Et 0 yr a S.i N ' a e.
ro °�
o Q 0 x o
U O p O m a ^o 0
.5 o a A o rL
NIS 0 3 >, m .. a
� .-fl
0 m m a F. d
a W V .- = a
t ilt O O" ' 0"1 I C
0 V1 W 0 N p a o I.
a) y .5 O
0 a S -
C / Li 4-i U 'D CU _ O O
Ca Ca c
.. o z ^d s>
O c
O ° .a 5
1 ¢ o .5 N 6,
V V') 0 b .. c � Q al
a • FO U G 0
e t O O
is
Ca a U i.4 ate. M •
O d) 0 t y c
0 � et
0 3 _ �U
= V � a) 0
0 w
U o . 3 .L+ y
_� y g 0 G h .... ta
"" S U O • C._
7k N U H N = L� tz
ca q H •� ea d C
.
0 •r O ,� r7
4.., d y 4O^ ' 1. .0 3 C y
n` . 0 j . L. W N 0 0.4
O
V Z v. _ ` .�i 6 In -
7 U p, .d m `^ c a
4 , . . , 7 N N 0 ti E O u 7
iLY F. a D W w 1 . -)—
.u, = d m U O - Q ._ y+
" 7 M U a .. V' �1 •^•s0
d E �. ti U ^O U" e•Ii
C u O U cn w Q O\ ° - m 0
a u 1.) 00 � a 0 on l V p I.
. o
zn o (ID o h
H 0 0 pa U = �, o o
•