RE: Richardson Minor Subdivision —Water and Wastewater Improvement Costs
Dear John:
At your request, Resource Engineering, Inc. developed a Preliminary Opinion of Probably
Cost for the water and wastewater improvements to serve Lot 2. The improvements include
a new well, pump, controls, pipeline and pressure tank for the water supply system and soils
testing, design, and construction of the OWTS to provide for wastewater disposal system.
The total cost for water and wastewater improvements is estimated at approximately $27,200
as shown on Table 1 below.
TABLE 1
Preliminary Opinion of Probably Cost
WATER SUPPLY
1. New well drilled and cased 100 feet deep $ 7,900
2. Pump installation, pitless adaptor, controls, electric panel $ 2,000
3. 75 feet % inch pipeline to the house, pressure tank $ 1,750*
Water Subtotal
WATEWATER
1. OWTS soil testing/design $ 2,000
2. OWTS installation1$ 0,000
Wastewater Subtotal
Plus 15% Contingency $ 3,550
Total
$11,650
$12,000
$27,200
Approximately 300 feet of %" PVC pipe currently runs between the existing well, on Lot 1, to an existing
spigot on Lot 2. This existing waterline will be utilized as the waterline from the new well on Lot 2, to
the new residence on Lot 2.
Consulting Engineers and Hydrologists
909 Colorado Avenue RF Glenwood Springs, CO 81601 N (970) 945-6777 E www.resource-eng.com
John L. Taufer
Page 2
Please call if you have any questions or need additional information.