Loading...
HomeMy WebLinkAbout1.05 Cost EstimatesR E S R E 0000. 0000. 0000. 00000 E N G I N E E R I N G I N C John L. Taufer September 11, 2019 John L. Taufer & Associates, Inc. PO Box 2271 Glenwood Springs CO 81602 RE: Richardson Minor Subdivision —Water and Wastewater Improvement Costs Dear John: At your request, Resource Engineering, Inc. developed a Preliminary Opinion of Probably Cost for the water and wastewater improvements to serve Lot 2. The improvements include a new well, pump, controls, pipeline and pressure tank for the water supply system and soils testing, design, and construction of the OWTS to provide for wastewater disposal system. The total cost for water and wastewater improvements is estimated at approximately $27,200 as shown on Table 1 below. TABLE 1 Preliminary Opinion of Probably Cost WATER SUPPLY 1. New well drilled and cased 100 feet deep $ 7,900 2. Pump installation, pitless adaptor, controls, electric panel $ 2,000 3. 75 feet % inch pipeline to the house, pressure tank $ 1,750* Water Subtotal WATEWATER 1. OWTS soil testing/design $ 2,000 2. OWTS installation1$ 0,000 Wastewater Subtotal Plus 15% Contingency $ 3,550 Total $11,650 $12,000 $27,200 Approximately 300 feet of %" PVC pipe currently runs between the existing well, on Lot 1, to an existing spigot on Lot 2. This existing waterline will be utilized as the waterline from the new well on Lot 2, to the new residence on Lot 2. Consulting Engineers and Hydrologists 909 Colorado Avenue RF Glenwood Springs, CO 81601 N (970) 945-6777 E www.resource-eng.com John L. Taufer Page 2 Please call if you have any questions or need additional information. Sincerely, RESOURCE ENGINEERING, INC. Michael J -rlon, P.E. Water R sources Engineer MJE/mmm 1548-1.0 September 11, 2019 "IE;RESOURCE iiwr E K D H E 11 p l r✓ O INC