Loading...
HomeMy WebLinkAbout3.0 Director's Determination 06.28.19Gurfield County June 28, 2019 Whit Whitaker 1009 Cattle Creek Ridge Rd. Carbondale, CO 81623 DIRECTOR DETERMINATION - Sills SDU Land Use Change Permit; Administrative Review (GAPA-04-19-8724) Dear Mr. Whitaker, This letter is provided to you, as the authorized representative for Garfield County File GAPA-04-L9-8124 pertaining to an application for a Secondary Dwelling Unit at 5345 County Road 100, Carbondale, CO. This letter is notification that your request has been reviewed by the Community Development Department and the Director hereby issues a determination conditionally approving the request. The conditions of approval are as follows: Conditions to be Satisfied Prior to lssuance of the Land Use Change Permit: 1. Prior to issuance of the Land Use Change Permit, the Applicant shall submit to the County the following for the well serving the SDU: a. A pump test that meets the standards in Section +-203(tvt)(1)(bXsXa). The pump test shall include representation by a qualified professional that the pump rate is adequate for the proposed use. b. A water quality test that meets the standards in Section 4-203(MX1Xb)(5)(c). The water quality test shall include representation by a qualified professional that the water quality meets the County's primary drinking standards. 2. Prior to issuance of the Land Use Change Permit, the Applicant shall work with Garfield County Vegetation Management to address issues from Steve Anthony's June 25, 2019 referral comments (Exhibit 13). A demonstration of compliance with this condition shall be provided by Garfield County Vegetation Management. I Operational Conditions: 3. All representations of the Applicant contained in the Application submittals shall be conditions of approval unless specifically amended or modified by the conditions contained herein. 4. At time of building permit, the Applicant shall submit a statement from a qualified professional indicating the feasibility of an Onsite Wastewater Treatment System for the SDU. 5. At time of building permit, the applicant shall submit a grading and drainage plan from a qualified professional verifying that the proposed grading and drainage is practical. 6. The new driveway for the SDU accessing off the existing driveway shall meet the Roadway Standards as detailed in Table 7-107 of the Land Use and Development Code. 7. The SDU shall be subject to all Garfield County Building Code Requirements. The property owner shall obtain all necessary Garfield County Building Permits for new construction, modifications and/or expansions to the structure. 8. The property owners shall obtain a Garfield County Onsite Wastewater Treatment System (OWTS) permit prior to installation of the system. 9. Due to very high wildfire susceptibility in the area where the SDU is to be constructed, the roof materials of the structure shall be comprised of noncombustible material. The Applicant shall also follow general Colorado State Forest Service standards for creating wildfire defensible spaces, as per Carbondale and Rural Fire Protection District referral comments (Exhibit 11). 10. The Applicant shall utilize bear-proof trash containers or store all trash within a secure portion of the structure such as a garage. 11. Any dogs kept on the property shall be kept in a fenced yard or on a leash to prevent harassment of wildlife. 12. Any new fencing on the property shall comply with the Colorado Parks and Wildlife specification for wild life-friendly fencing. 13. All exterior lighting shall be downcast and shielded and comply with Section 7-304, Lighting Standards, ofthe Land Use and Development Code of 2013, as amended. 14. The Applicant shall comply with all Additional Standards for Residential Uses contained in Section 7-701.B, Secondary Dwelling Units, ofthe Land Use and Development Code of 2013, as amended. Notice of this decision will be provided to the Board of County Commissioners who has the ability to 'call-up'the application for review at a public hearing. You will be notified ofthe Board decision once it is received or upon expiration of the 10 day notice period (July 8, 2019). 2 Feel free to contact myself or Claire Dalby, the staff planner, if you have any questions regarding this decision. She Dire Bower, AICP or of Community Development Att hment Cc BOCC File J Sincerely,