Loading...
HomeMy WebLinkAbout17.0 Driveway PermitEXHIBIT 16 Driveway Permit Garfield County Road and Bridge Department 0298 CR 333A Rifle, CO 81650 Phone-(970)625-8601 Fax- (970)625-8627 Invoice Driveway Permit Number: GRB19-D-33 Invoice Date: 10/24/2019 Bill To: Kirstie Steiner 736 CR 137 Glenwood Springs ,CO 81601 $75.00 per Driveway Permit. Driveway Permit Fee: $75.00 Total Due: $75.00 Thank You! 5er - 'f-C -UYV1. _Thor 1c yoca Garfield County Application for Driveway Permit Person Obtaining Permit: IGrstie Steiner Application Date: 10/24/2019 County Road Number: 137 District: Glenwood Permit Number: GRB19-D-33 Termination Date: 1/22/2020 Inspector: Dale Stephens hereby requests permission and authority from the Board of County Commissioners to construct a driveway approach (es) on the right-of-way off of County Road, 137a 0' of 156, located on the East side of road for the purpose of obtaining access to property. Applicant submits herewith for the consideration and approval of the Board of County Commissioners, a sketch of the proposed installation showing all the necessary specification detail including: 1. Frontage of lot along road. 2. Distance from centerline of road to property line. 3. Number of driveways requested 4. Width of proposed driveways and angle of approach. 5. Distance from driveway to road intersection, if any. 6. Size and shape of area separating driveways if more than one approach. 7. Setback distance of building(s) and other structure improvements. 8. No unloading of equipment on county road, any damage caused to county road will be repaired at subdivision expense. 9. Responsible for two years from the date of completion. General Provisions 1) The applicant represents all parties in interest, and affirms that the driveway approach (es) is to be constructed by him for the bona fide purpose of securing access to his property and not for the purpose of doing business or servicing vehicles on the road right of way. 2) The applicant shall furnish all labor and materials, perform all work, and pay all costs in connection with the construction of the driveway(s). All work shall be completed within ninety (90) days of the permit date. 3) The type of construction shall be as designated and/or approved by the Board of County Commissioners or their representative and all materials used shall be of satisfactory quality and subject to inspection and approval of the Board of County Commissioners or their representative. 4) The traveling public shall be protected during the installation with proper warning signs and signals and the Board of County Commissioners and their duly appointed agents and employee shall be held harmless against any action for personal injury or property damage sustained by any reason of the exercise of the Permit. 5) The Applicant shall assume responsibility for the removal or clearance of snow, ice, or sleet upon any portion of the driveway approach (es) even though deposited on the driveway(s) in the course of the County snow removal operations, 6) In the event it becomes necessary to remove any right-of-way fence, the posts on either side of the entrance shall be surely braced before the fence is cut to prevent any slacking of the remaining fence and all posts and wire removed shall be turned over to the District Road Supervisor of the Board of County Commissioners. 7) No revisions or additions shall be made to the driveway(s) or its appurtenances on the right-of-way without written permission of the Board of County Commissioners. 8) Provisions and specifications outlined herein shall apply on all roads under the jurisdiction of the Board of County Commissioners of Garfield County, Colorado, and the Specifications, set forth on the attached hereof and incorporated herein as conditions hereof. 9) Final inspection of driveway will be required upon completion and must be approved by person issuing permit or representative of person issuing permit. The inspection and sign off must be done prior to any CO from the Building and Planning Department being issued. Skeels! Conditions: 1. Driveway Width- 30ft 2. Culvert required? False Size: N/A by N/A 3. Asphalt or concrete pad required? True Size of pad: 30ft Wide x 10ft long x 4in thick 4. Gravel portion required? False Length: N/A 5. Trees, brush and/or fence need to be removed for visibility? False 6. Distance and Direction:N/A 7. Certified Traffic Control Required? False S. Work zone signs required? True In signing this application and upon receiving authorization and permission to install the driveway approach (es) described herein the Applicant signifies that he has read, understands and accepts the foregoing provisions and conditions and agrees to constrict the driveway(s) in accordance with the accompanying specification plan reviewed and approved by the Board of County Commissioners. Signal: Address: Telephone Number: Permit granted 10/24/2019, subject to the provisions, specifications and conditions stipulated herein. For Board of County Commissioners' of Garfield County, Colorado: Representative of Garfield County Road and Bridge Signature Specifications 1. A driveway approach is understood to be that portion of the county road right -of way between the pavement edge and the property line that is designed and used for the interchange of traffic between the roadway and abutting property. 2. At any intersection, a driveway shall be restricted for a sufficient distance from the intersection to preserve the normal and safe movement of traffic. (It is recommended for rural residence entrances that a minimum intersection clearance of 50 feet be provided and for rural commercial entrances a rnininuun of 100 feet be provided.) 3. All entrances and exits shall be so located and constructed that vehicles approaching or using them will be able to obtain adequate sight distance in both directions along the county road in order to maneuver safely and without interfering with county road traffic. 4. The Applicant shall not be permitted to erect any sign or display material, either fixed or movable, on or extending over any portion of the county road right-of-way. 5. Generally, no more than one approach shall be allowed any parcel or property the frontage of which is less than one hundred (100) feet. Additional entrances or exits for parcels having a frontage in excess of one hundred 100) feet shall be permitted only after showing of actual convenience and necessity. 6. All driveways shall be so located that the flared portion adjacent to the traveled way will not encroach upon adjoining property. 7. No commercial driveway shall have a width greater than thirty (30) feet measured at right angles to the centerline of the driveway except as increased by permissible radii. No noncommercial driveway shall have a width greater than twenty (20) feet measured at right angles to the centerline of the driveway, except as increased by permissible radii. 8. The axis of an approach to the road may be at a right angle to the centerline of the county road and of any angle between ninety (90) degrees and sixty (60) degrees but shall not be less than sixty (60) degrees. Adjustment will be made according to the type of traffic to be served and other physical conditions. 9. The construction of parking or servicing areas on the county road right-of-way is specifically prohibited. Commercial establishments for customer vehicles should provide off -the -road parking facilities. 10. The grade of entrance and exit shall slope downward and away from the road surface at the same rate as the normal shoulder slope and for a distance equal to the width of the shoulder but in no case less than twenty (20) feet from the pavement edge. Approach grades are restricted to not more than ten percent (10%). 11. All driveways and approaches shall be so constructed that they shall not interfere with the drainage system of the street or county road. The Applicant will be required to provide, at his own expense, drainage structures at entrances and exits, which will become an integral part of the existing drainage system. The Board of County Commissioners or their representative, prior to installation, nmst approve the dimensions and types of all drainage structures. Note: This permit shall be made available at the site where and when work is being done. A work sketch or drawing of the proposed driveway(s) must accompany application. No permit will be issued without drawing, blueprint, or sketch. x Or Driveway Permits & Utility Permit Check List Application given to Dale on (U ' 4 7 j q Date Approved application given back to Rayjean or Jayme with check list on Date Forwarded application to Foreman for them to approve on Date Application given back to Rayjean or Jayme with check list on Date Exemption Letter Checklist • Use the exemption letter template. • Send letter as a PDF not a Word document. • Send to customer and Community Development (Brooke Winschell & Lindsay Krol) • CC: Rayjean and Jayme • Turn check list in to Rayjean or Jayme Or Application given to Dale on Date Letter sent to customer, Community Development and CC: Rayjean & Jayme on Date Forwarded application to Foreman for them to complete on Date Letter sent to customer, Community Development and CC: Rayjean & Jayme on Date Garfield County Road and Bridge 0298 CR 333A Rifle, CO 81650 PH: 970-625-8601 Fax: 970-625-8627 Email: roadandbridge@gart'ield-county.corn Garfield County Driveway Permit Requirements Information required by Garfield County Road & Bridge for driveway permits or exemption letters: • State your request (driveway permits vs. exemption). • Legal Description; lot & block # preferred, meets & bounds if necessary. • Plat or sketch, showing driveway location and any easements (must show nearest County Road and be easily readable). • Owner's mailing address, phone, and email. • Subcontractor (if applicable) with phone number. • Be prepared to show your property pins/corners. Quick reference guideline for new or change of use driveways. • Only one access per parcel (unless need demonstrated). • 90 degree intersection with County Road for first 30 feet. • 3 % maximum grade for first 30 feet. • 4" thick hot asphalt or concrete apron if County Road is paved or chip sealed. • 300 feet visibility in both directions. • Corrugated steel culvert if a road ditch is crossed. • Driveway runoff must not reach County Road. • Completed and signed permit must be obtained prior to commencing work and permit must be kept on jobsite for the entire duration of the project. • All work must be completed within 90 days of permit issuance. The Road and Bridge office will issue the permit. It can be picked up at the above address, emailed, or faxed upon receipt of payment. Make checks out to Garfield County Road and Bridge, please include permit number on your check. We also accept Visa & MasterCard. Garfield County does not retain credit card information. Garfield County Road and Bridge 0298 CR 333A Rifle, CO 81650 PH: 970-625-8601 Fax: 970-625-8627 Email: roadandbridge agarfield-countycom Driveway Permit Application Permit Fee: $75.00 1. Property Owner: Kirstie Steiner 2. Mailing Address: 736 County Road 137 3. City, State, Zip: Glenwood Springs, CO 81601 4. Phone No: Email: ocreek a[7gmail.cam 5. Sub -contractor: Hayes Construction Inc. Phone: 970-618-6525 6. Estimated Start Date: 7. County Road No: 137 8. Nearest Intersection or Address: 156 9. Distance from Int. or Address: 0' 10. Direction from Int. or Address: 11. Side of Road: • 12. Width of apron: 13. Culvert Required: 14. Size of culvert required: 15. Length of Culvert: 7 7 16. Asphalt or concrete pad required: 17. Size of Pad: x x x N N 30-foot Yes 12-inch 30-foot Yes E E 40-foot 15-inch 40-foot No S S W W 100-foot Other: 18-inch Other: 100-foot Other: 30-foot wide X 10-foot long X 4 inches thick 40-foot wide X 10-foot long X 4 inches thick 100-foot wide X 20-foot long X 4 inches thick 18. Gravel Recommended: Yes x No **Gravel recommended so as to not track mud onto County Road. 19. Length of gravel portion: 20. Trees of brush removed for visibility: 40-foot Yes x 50-foot No 100-foot 21. Distance and direction from driveway to be removed: 22. Driveway must be no more than 3 % slope away from County Road. 23. Driveway must be constructed so that no drainage accesses the County Road. 24. Certified traffic control required: 25. Work zone signage only required: 26. Stop sign required at entrance to County Road: Yes Yes Yes x No -Sclo x No 27. Inspection of driveway will be required upon completion and must be approved by Garfield County Road and Bridge. 28. Person Requesting Permit: Douglas Hayes, Hayes Construciton Inc. 29. Person approving Permit: 30. Date approved: Check Name of Cardholder: Billing Address: Card Number: / / Expiration Date: / Payment Information Visa MasterCard / / / / / / / / / / V Code (last 3 or 4 numbers on back of card) Signature Required: Authorized Card Holder Signature oavgcno,ISOT»J640(.N3i9 %NNOJ ax31JWV9 k9NVa >laa>n daV47aO CV /'13L98LI-LZ6 MS) b59/2'0J'SVVWMONS '421:il3LO SlVINMONS q8(l '71 joa uko*V - a —QY 1-Qnod Rem 01461y OL eielejejul L1