Loading...
HomeMy WebLinkAbout1.21 2018 Access Permit - GEMAT CircleCOLORADO Department of Transportation Region 3 Traffic and Safety Section 222 S. Sixth St, Room 100 Grand Junction, Colorado 81501 PH (970) 683-6284 FAX (970) 683-6290 «< E-mailed September 27, 2018 Big R Lot Owners Association 407 South Hunter Street, #7 Aspen, Colorado 81611 »> Re: State Highway Access Permit No. 318105, located in Garfield County on Highway 006 near Mile Marker Reference Pt. 94.6 Left Dear Applicant/Permittee: The Colorado Department of Transportation (CDOT) has received your signed permit and application fee. A copy of the issued permit is enclosed. This permit is valid for one year from the date of issue. If construction does not occur within the first year, the Applicant/Permittee may request in writing, an extension for another year. This permit may be extended twice for a total of two (2) additional years. If construction does not occur within the third year, a new application shall be submitted and the permit process shall begin again. The next step in the CDOT access permitting process is for you, Applicant/Permittee, to request a Notice to Proceed (NTP) from CDOT. You may NOT proceed with any construction without receiving an approved Notice to Proceed (NTP) from CDOT. Failure of receiving a Notice to Proceed prior to any construction will be a violation of the State Highway Access Code (2 CCR 601-1,"the Code") § 2.4. Notice to Proceed Steps and Requirements The request for NTP shall include the following steps and associated documents, along with any other items specified in the Terms and Conditions of your permit: 1) Request a Notice to Proceed Well in advance of construction, the Permittee shall make a written request for a Notice to Proceed (NTP) to Devin Drayton, Access Project Manager, 222 S. 6th St, Rm 100, Grand Junction, CO 81501 (or by email to Devin.Drayton@state.co.us). He may be reached by phone at: (970) 683-6286. 2) Schedule a Pre -Design Meeting with the Access Project Manager The following persons should be in attendance: Permittee/Property Owner or their representative, a CDOT representative, the Engineer of Record, the Construction Superintendent, the Traffic Control Supervisor, and Permittee/Property Owner (or Property Owner's Representative if other than Applicant). 3) Submit Complete Construction Plans (Please include the name of the Engineering Firm and/or the Professional Engineer with their contact information.) The Applicant shall provide four (4) hard copies and one (1) electronic copy of 11X17 construction plans and specifications (at the scale of 1" = 50 feet) for the proposed improvements. The plans shall: A. Address (as applicable) the geometry, striping, signing, and signalization; and B. Include (but not be limited to) the layout of the access, highway improvements, utility locations, existing and proposed drainage, existing and proposed right-of-way lines, existing and proposed traffic control devices, and a clear zone analysis; and C. Be signed and sealed by a Colorado Professional Engineer in accordance with CRS 12-25-117; and D. Conform to the requirement of the permit's "Terms and Conditions"; and E. Include the following statement on the cover page of the plans: "This design is in full compliance with Section 4 of the State Highway Access Code, 2 CCR 601-1 except for the following approved design waivers:" 4) Complete and Submit the Notice to Proceed Checklist The Applicant shall submit a NTP Checklist that was received from the Project Manager at the Pre -design meeting. The NTP checklist shall be completed with: A. The Engineer Design Certificate shall be completed, signed, and sealed by the Engineer of Record (See page 13). B. Complete and provide all required items marked with an "X" on this checklist and then mark an "X" in the provided column. C. This Checklist and associated plans and specifications will be included as exhibits to the NTP. 5) Construction Progress Schedule The Applicant shall provide a construction progress schedule that identifies all critical path items, including but not limited to: excavation, embankment, surfacing, culvert installation, traffic control placement and removal, and access construction completion. 6) Provide CDOT with Performance Bond(s) The performance bond must be at least 110% of the estimated total highway construction costs. Bonding agency must be licensed to do business in the State of Colorado. A cost estimate, sealed by a Colorado registered professional engineer, and a draft of each bond must be provided and approved by CDOT, prior to issuing a NTP. 7) Insurance Liability Certification The Applicant or contractor shall be required to provide a comprehensive general liability and property damage insurance (naming CDOT—and the Issuing Authority if applicable-- as an additional insured party for liability) in the amounts of not less than $1,000,000 per occurrence and automobile liability insurance of $1,000,000 (for combined single -limit bodily injury and for property damage) for each occurrence during the period of access construction. 8) Traffic Control Plan (TCP) The traffic control plan must: A. Comply with CDOT Standard Plans Manual for Maintenance and Signing; and 222 S. Sixth St., Room 100, Grand Junction, Colorado 81501 PH (970) 683-6284 FAX (970) 683-6290 www.codot.gov Page 2 of 3 B. Be consistent with the MUTCD, identifying the type, number and spacing for all devices; and C. Be prepared by individual with American Traffic Safety Services Association (ATSSA) or Colorado Contractors Association certification - or sealed (stamped) by a Colorado registered professional engineer; and D. Be acceptable to CDOT prior to any construction within the right-of-way; and E. Be presented in a manner that provides a method of handling traffic (MHT) for each different phase of construction; and F. Describe the MHT according to the proposed construction phasing and include dimensioned diagrams of work zone elements, with the final traffic control plan submitted a minimum of three working days in advance of construction. (Such plans may be revised as necessary with CDOT concurrence.) Once all requested submittals have been received, CDOT has seven (7) days to determine if the NTP submittal is complete for review and then, if necessary, notify the applicant of any deficiencies. If complete, CDOT will review and comment on the submitted information within thirty (30) days. If CDOT determines the information is unacceptable, missing, or in need of correction, the Applicant/Permittee shall correct their submittal and resubmit the complete request for NTP. Once resubmitted, CDOT will review the revised NTP documents within ten (10) days. If the revised documents are satisfactory, CDOT will issue a NTP. If further corrections are necessary, the cycle of submittal, review and comments will repeat itself until approval is granted and the NTP is issued. If you have any questions regarding the process or the required documents, please don't hesitate to contact me or Devin. Respectfully, /.,-- aiitw\ Region 3 Permit Manager Cc: Devin Drayton, Project Manager Alex Karami, HQ Staff Access Manager File 222 S. Sixth St., Room 100, Grand Junction, Colorado 81501 PH (970) 683-6284 FAX (970) 683-6290 www.codot.gov Page 3 of 3 COLORADO DEPARTMENT OF TRANSPORTATION STATE HIGHWAY ACCESS PERMIT CDOT Permit No. 318105 State Highway No / Mp / Side 006D / 94.600 / Left Permit Fee $300.00 Date of Transmittal 09/06/2018 Region / Section / Patrol / Name 3 / 02 / 2K10 Vacant Local Jurisdiction Garfield County The Permittee(s): The Applicant(s): Big R Lot Owners Association Dan Cokley, P.E. 407 South Hunter Street, #7 118 W 6th St, Ste 200 Aspen, Colorado 81611 Glenwood Springs, Colorado 81601 (970) 945-1004 is hereby granted permission to have an access to the state highway at the location noted below. The access shall be constructed, maintained and used in accordance with this permit, including the State Highway Access Code and any attachments, terms, conditions and exhibits. This permit may be revoked by the Issuing Authority if at any time the permitted access and its use violate any parts of this permit. The issuing authority, the Department and their duly appointed agents and employees shall be held harmless against any action for personal injury or property damage sustained by reason of the exercise of the permit. Location: Access to Provide Service to: (Land Use Code) (Size) (Units) 130 - Industrial Park Gemat Circle Road 100 DHV Additional Information: This is for Big R Commercial Park Subdivision. Also known as Gemat Circle Road. MUNICIPALITY OR COUNTY APPROVAL Required only when the appropriate local authority retains issuing authority. Signature Print Name Date Title Upon the signing of this permit the permittee agrees to the terms and conditions and referenced attachments contained herein. All construction shall be completed in an expeditious and safe manner and shall be finished within 45 cays from Initiation. The permitted access shall be completed in accordance with the terms and conditions of the permit prior to being used. The permittee shall notify Adonna McDade Ward 2K3 with the Colorado Department of Transportation, at (970) 384-3396 at least 48 hours prior to commencing construction within the State Highway right-of-way. The person signing as the permittee must be the owner or legal representative of the property served by the permitted access and have full authority to accept the permit and its terms and conditions. Permittee Signature; Print Name Date 1 Co-Permittee Signature: (if applicable) Print Name ! Date This permit is not valid until signed by a duly authorized representative of the Department. OLORADO DE TMENT OF TRANSPORTATION natu 0 ?jnnt Name p Title Date (of issue) Copy Distribution: Required:. 1.Region 2.Applicant Make copies as necessary tor. 3.Staff Access Section Local Authority Inspector MTCE Patrol Traffic Engineer 4.Central Files ions editions are obsolete and may not be used Page 1 of 3 CDOT Form #101 5/07 State Highway Access Permit Form 101, Page 2 The following paragraphs are excerpts of the State Highway Access Code. These are provided for your convenience but do not alleviate compliance with all sections of the Access Code. A copy of the State Highway Access Code is available from your local issuing authority (local government) or the Colorado Department of Transportation (Department). When this permit was issued, the issuing authority made its decision based in part on information submitted by the applicant, on the access category which is assigned to the highway, what alternative access to other public roads and streets is available, and safety and design standards. Changes in use or design not approved by the permit or the issuing authority may cause the revocation or suspension of the permit. APPEALS 1. Should the permittee or applicant object to the denial of a permit application by the Department or object to any of the terms or conditions of a permit placed there by the Department, the applicant and permittee (appellant) have a right to appeal the decision to the [Transportation] Commission [of Colorado]. To appeal a decision, submit a request for administrative hearing to the Transportation Commission of Colorado within 60 days of transmittal of notice of denial or transmittal of the permit for signature. Submit the request to the Transportation Commission of Colorado, 4201 East Arkansas Avenue, Denver, Colorado 80222-3400. The request shall include reasons for the appeal and may include changes, revisions, or conditions that would be acceptable to the permittee or applicant. 2. Any appeal by the applicant or permittee of action by a local issuing authority shall be filed with the local authority and be consistent with the appeal procedures of the local authority. 3. In submitting the request for administrative hearing, the appellant has the option of including within the appeal a request for a review by the Department's internal administrative review committee pursuant to [Code] subsection 2.10. When such committee review is requested, processing of the appeal for formal administrative hearing, 2.9(5) and (6), shall be suspended until the appellant notifies the Commission to proceed with the administrative hearing, or the appellant submits a request to the Commission or the administrative law judge to withdraw the appeal. The two administrative processes, the internal administrative review committee, and the administrative hearing, may not run concurrently. 4. Regardless of any communications, meetings, administrative reviews or negotiations with the Department or the internal administrative review Committee regarding revisions or objections to the permit or a denial, if the permittee or applicant wishes to appeal the Department's decision to the Commission for a hearing, the appeal must be brought to the Commission within 60 days of transmittal of notice of denial or transmittal of the permit. PERMIT EXPIRATION 1. A permit shall be considered expired if the access is not under construction within one year of the permit issue date or before the expiration of any authorized extension. When the permittee is unable to commence construction within one year after the permit issue date, the permittee may request a one year extension from the issuing authority. No more than two one-year extensions may be granted under any circumstances. If the access is not under construction within three years from date of issue the permit will be considered expired. Any request for an extension must be in writing and submitted to the issuing authority before the permit expires. The request should state the reasons why the extension is necessary, when construction is anticipated, and include a copy of page 1 (face of permit) of the access permit. Extension approvals shall be in writing. The local issuing authority shall obtain the concurrence of the Department prior to the approval of an extension, and shall notify the Department of all denied extensions within ten days. Any person wishing to reestablish an access permit that has expired may begin again with the application procedures. An approved Notice to Proceed, automatically renews the access permit for the period of the Notice to Proceed. CONSTRUCTION 1. Construction may not begin until a Notice to Proceed is approved. (Code subsection 2.4] 2. The construction of the access and its appurtenances as required by the terms and conditions of the permit shall be completed at the expense of the permittee except as provided in subsection 2.14. All materials used in the construction of the access within the highway right-of-way or on permanent easements, become public property. Any materials removed from the highway right-of-way will be disposed of only as directed by the Department. All fencing, guard rail, traffic control devices and other equipment and materials removed in the course of access construction shall be given to the Department unless otherwise instructed by the permit or the Department inspector. 3. The permittee shall notify the individual or the office specified on the permit or Notice to Proceed at least two working days prior to any construction within state highway right-of-way. Construction of the access shall not proceed until both the access permit and the Notice to Proceed are issued. The access shall be completed in an expeditious and safe manner and shall be finished within 45 days from initiation of construction within the highway right-of-way. A construction time extension not to exceed 30 working days may be requested from the individual or office specified on the permit. 4. The issuing authority and the Department may inspect the access during construction and upon completion of the access to ensure that all terms and conditions of the permit are met. Inspectors are authorized to enforce the conditions of the permit during construction and to halt any activities within state right-of-way that do not comply with the provisions of the permit, that conflict with concurrent highway construction or maintenance work, that endanger highway property, natural or cultural resources protected by law, or the health and safety of workers or the public. 5. Prior to using the access, the permittee is required to complete the construction according to the terms and conditions of the permit. Failure by the permittee to abide by all permit terms and conditions shall be sufficient cause for the Department or issuing authority to initiate action to suspend or revoke the permit and close the access. If in the determination of the Department or issuing authority the failure to comply with or complete the construction requirements of the permit create a highway safety hazard, such shall be sufficient cause for the summary suspension of the permit. If the permittee wishes to use the access prior to completion, arrangements must be approved by the issuing authority and Department and included in the permit. The Department or issuing authority may order a halt to any unauthorized use of the access pursuant to statutory and regulatory powers. Reconstruction or improvement of the access may be required when the permittee has failed to meet required specifications of design or materials. If any construction element fails within two years due to improper construction or material specifications, the permittee shall be responsible for all repairs. Failure to make such repairs may result in suspension of the permit and closure of the access. 6. The permittee shall provide construction traffic control devices at all times during access construction, in conformance with the M.U.T.C.D. as required by section 42- 4-104, C.R.S., as amended. 7. A utility permit shall be obtained for any utility work within highway right-of-way. Where necessary to remove, relocate, or repair a traffic control device or public or private utilities for the construction of a permitted access, the relocation, removal or repair shall be accomplished by the permittee without cost to the Department or issuing authority, and at the direction of the Department or utility company. Any damage to the state highway or other public right-of-way beyond that which is allowed in the permit shall be repaired immediately. The permittee is responsible for the repair of any utility damaged in the course of access construction, reconstruction or repair. 8. In the event it becomes necessary to remove any right- of-way fence, the posts on either side of the access shall be securely braced with an approved end post before the fence is cut to prevent any slacking of the remaining fence. All posts and wire removed are Department property and shall be turned over to a representative of the Department. 9. The permittee shall ensure that a copy of the permit is available for review at the construction site at all times. The permit may require the contractor to notify the individual or office specified on the permit at any specified phases in construction to allow the field inspector to inspect various aspects of construction such as concrete forms, subbase, base course compaction, and materials specifications. Minor changes and additions may be ordered by the Department or local authority field inspector to meet unanticipated site conditions. 10. Each access shall be constructed in a manner that shall not cause water to enter onto the roadway or shoulder, and shall not interfere with the existing drainage system on the right-of-way or any adopted municipal system and drainage plan. 11. By accepting the permit, permittee agrees to save, indemnify, and hold harmless to the extent allowed by law, the issuing authority, the Department, its officers, and employees from suits, actions, claims of any type or character brought because of injuries or damage sustained by any person resulting from the permittee's use of the access permit during the construction of the access. CHANGES IN ACCESS USE AND PERMIT VIOLATIONS 1. It is the responsibility of the property owner and permittee to ensure that the use of the access to the property is not in violation of the Code, permit terms and conditions or the Act. The terms and conditions of any permit are binding upon all assigns, successors -in -interest, heirs and occupants. If any significant changes are made or will be made in the use of the property which will affect access operation, traffic volume and or vehicle type, the permittee or property owner shall contact the local issuing authority or the Department to determine if a new access permit and modifications to the access are required. 2. When an access is constructed or used in violation of the Code, section 43-2-147(5)(c), C.R.S., of the Act applies. The Department or issuing authority may summarily suspend an access permit and immediately order closure of the access when its continued use presents an immediate threat to public health, welfare or safety. Summary suspension shall comply with article 4 of title 24, C.R.S. MAINTENANCE 1. The permittee, his or her heirs, successors -in -interest, assigns, and occupants of the property serviced by the access shall be responsible for meeting the terms and conditions of the permit, the repair and maintenance of the access beyond the edge of the roadway including any cattle guard and gate, and the removal or clearance of snow or ice upon the access even though deposited on the access in the course of Department snow removal operations. Within unincorporated areas the Department will keep access culverts clean as part of maintenance of the highway drainage system. However, the permittee is responsible for the repair and replacement of any access -related culverts within the right-of-way. Within incorporated areas, drainage responsibilities for municipalities are determined by statute and local ordinance. The Department will maintain the roadway including auxiliary lanes and shoulders, except in those cases where the access installation has failed due to improper access construction and/or failure to follow permit requirements and specifications in which case the permittee shall be responsible for such repair. Any significant repairs such as culvert replacement, resurfacing, or changes in design or specifications, requires authorization from the Department. Form 101, Page 3 September 6, 2018 PERMIT No. 318105 Permittee(s): Big R Lot Owners Association Location: Garfield County on CO Highway 006D, near Mile Ref. Pt. 94.6 Left 1. This permitted access is only for the use and purpose stated in the Application and Permit. This Permit is issued in accordance with the State Highway Access Code (2 CCR 601-1), and is based in part upon the information submitted by the Permittee. Any subsequent relocation, reconstruction, or modifications to the access or changes in the traffic volume or traffic nature using the access shall be requested for by means of a new application. Any changes causing non-compliance with the Access Code may render this permit void, requiring a new permit. 2. This permit replaces permit any and all additional access permits that may be in existence for this access. 3. This permit is for industrial complex also known as Gemat Circle Road. 4. The traffic volume shall be 100 DHV. 5. This access shall have a full turning -movement. 6. The existing driveway at MP 94.58 (150' west of Gemat Circle Road) shall be removal, including: (a) Removal of asphalt up to the edge of the paved shoulder of the highway, (b) Removal of culvert, (c) Regrading to match the cross-section east and west of the driveway, (d) Placement of topsoil and reseeding. 7. The existing access at mile post 94.49 has an access permit (# 399019) with a volume of 200 vehicles per day. The volume is projected to remain at or below the permitted volume, so no changes are required. However, if the of the access (mile post 94.49) on Lot 1 changes in accordance with the 2.6 of Access Code, this access shall close and the primary access on Lot shall be through Gemat Circle Road. 8. The Permittee shall design and construct a left -turn deceleration in accordance with Section 4 of the Access Code (2 CCR 601-1). 9. A full width 2-inch minimum depth overlay of the entire length of highway improvements shall be required in accordance with section 4.7(6) of the Access Code. 10. This access shall be constructed 25-40 feet wide. This access shall be constructed with turning radii to accommodate an AASHTO WB-50 turning radius. The turning radius shall be measured from the white line on the Hwy to the edge of the driveway. A drawing of the design vehicle turning template for the largest vehicle entering/exiting site will be required to ensure proper radius and lane widths. 11. The horizontal axis of the access to the State Highway shall be constructed perpendicular to the centerline of the highway and extend from the edge of the roadway a minimum distance of 40 feet, or to the property line, whichever is greater. This design shall be in conformance with section 4 of the State Highway Access Code, 2CCR 601-1. 12. Side slopes shall be at a 4:1 slope on the roadway. The roadway shall slope away from the highway at a -2% grade for the first 20 feet of driveway. This design shall be in conformance with section 4 of the State Highway Access Code, 2CCR 601-1. 13. Immediately upon completion of earthwork, and prior to use, this access shall be surfaced in accordance with Section 4.7 of the Access. This access shall be hard surfaced in accordance with Section 4.7 of the Access Code. September 6, 2018 PERMIT No. 318105 Permittee(s): Big R Lot Owners Association Location: Garfield County on CO Highway 006D, near Mile Ref. Pt. 94.6 Left 14. The access shall be hard -surfaced a minimum distance of 50 feet from the traveled way, or to the CDOT Right -of -Way, whichever is greater. Where the hard surface is to abut the existing pavement, the existing pavement shall be saw cut and removed a minimum of one foot back from the existing edge for bituminous, or until an acceptable existing cross slope is achieved. Surfacing shall meet the Department's specifications with minimum surfacing to be equal to, or greater than, existing highway conditions. 15. The Permittee shall provide a performance bond that will insure completion of the required highway and all related intersection improvements in conformance with all Department standards and specifications. The bond must be at least 110% of the estimated total highway construction cost and the bonding agency must be surety licensed to do business in the State of Colorado. A thorough Construction Cost Estimate sealed by a Colorado Registered Professional Engineer and a draft of the bond must be provided and approved by Department before acceptance of the final bond and before construction is approved to commence. 16. A design meeting is required prior to construction design. Required personnel for this meeting are: Professional Engineer of Record (i.e., the person who shall sign and seal the plan set), Design Engineer, and Permittee. Please contact Devin Drayton 970-683-6286 for scheduling this design meeting. 17.Materials, Placing, and Compaction For Level 3 projects, the specifications for materials and compaction shall be discussed and determined at the pre -design meeting with the Region 3 Access Project Engineer. Unless the Applicant has approval from the Access Manager who may state otherwise, the following are requirements for driveway construction: Hot Mix Asphalt Option (HMA) Base: 16 inches of class 6 gravel with maximum 6-inch lifts; Surface: 4 inches of HMA in two, 2-inch lifts; Compaction of the subgrade, embankments and backfill shall comply with sections 203 Et 304 of the Colorado Highway Standard Specifications for Road and Bridge Construction. Concrete Pavement Option: Portland Cement (PCCP) Base: 4 inches of class 6 gravel; Surface: A minimum of 6" of doweled and tied PCCP. Compaction of the subgrade, embankments and backfill shall comply with sections 203 Et 304 of the Colorado Highway Standard Specifications for Road and Bridge Construction. 18. A Notice to Proceed, CDOT Form 1265, must be issued by CDOT before beginning construction on the access or any activity within the highway Right -of -Way. 19. To receive the Notice to Proceed the applicant shall submit a complete packet to CDOT with the following items: (a) Prior to the issuance of any Notice to Proceed, the applicant shall schedule a pre - construction meeting including but not limited to applicant, Engineer of Record, Construction Inspector, construction personnel, Permittee (if other than applicant), CDOT representative and Traffic Control Supervisor. September 6, 2018 PERMIT No. 318105 Permittee(s): Big R Lot Owners Association Location: Garfield County on CO Highway 006D, near Mile Ref. Pt. 94.6 Left (b) A construction schedule-- required at the pre -construction meeting. (c) A cover letter requesting a Notice to Proceed. (d) Certificate of Insurance Liability as per Section 2.3(11)(i) of the State Highway Access Code, naming CDOT as an additional insured for general liability. (e) A certified Traffic Control Plan in accordance with Section 2.4(6) of the Access Code. The Traffic Control Plan shall provide accessibility features to accommodate all pedestrians including persons with disabilities for all pathways during construction. (f) One Electronic PDF &t Four copies of Construction Plans Stamped (11 "x 17" with a minimum scale of 1" = 50') by a Colorado Registered Professional Engineer in full compliance with the State Highway Access Code. (g) Signed and sealed Notice to Proceed Checklist. (h) Signed and Approved Performance Bond. (i) Signed and sealed Drainage Report or narrative. 20. No drainage from this site shall enter onto the State Highway travel lanes. The Permittee is required to maintain all drainage in excess of historical flows and time of concentration on site. All existing drainage structures shall be extended, modified or upgraded, as applicable, to accommodate all new construction and safety standards, in accordance with the Department's standard specifications. 21. Open cuts, which are at least 4 inches in depth, within 30 feet of the edge of the State Highway traveled way, will not be left open at night, on weekends, or on holidays, or shall be protected with a suitable barrier per State and Federal Standards. 22. Nothing in this permit shall prohibit the Chief Engineer from exercising the right granted in CRS 43-3-102 Including but not limited to restricting left hand turns by construction of physical medial separations. 23. The Permittee is responsible for obtaining any necessary additional Federal, State and/or City/County permits or clearances required for construction of the access. Approval of this access permit does not constitute verification of this action by the Permittee. Permittee is also responsible for obtaining all necessary utility permits in addition to this access permit. 24. All workers within the State Highway right-of-way shall comply with their employer's safety and health policies/procedures, and all applicable U.S. Occupational Safety and Health Administration (OSHA) regulations - including, but not limited to the applicable sections of 29 CFR Part 1910 - Occupational Safety and Health Standards and 29 CFR Part 1926 - Safety and Health Regulations for Construction. Personal protective equipment (e.g. head protection, footwear, high visibility apparel, safety glasses, hearing protection, respirators, gloves, etc.) shall be worn as appropriate for the work being performed, and as specified in regulation. 25. The Permittee shall provide accessibility features to accommodate all pedestrians including persons with disabilities for all pathways during and after construction. 26. The Permittee is required to comply with the Americans with Disabilities Act Accessibility Guidelines (ADAAG) that have been adopted by the U.S. Architectural and Transportation Barriers Compliance Board (Access Board), and incorporated by the U.S. Attorney General as a federal standard. These guidelines are defining traversable slope requirements and prescribing the use of a defined pattern of truncated domes as detectable warnings at street September 6, 2018 PERMIT No. 318105 Permittee(s): Big R Lot Owners Association Location: Garfield County on CO Highway 006D, near Mile Ref. Pt. 94.6 Left crossings. The new Standards Plans and can be found on the Design and Construction Project Support web page at: https://www.codot.gov/business/designsupport/standard-plans . 27. When it is necessary to remove any highway right-of-way fence, the posts on either side of the access entrance shall be securely braced with approved end posts and in conformance with the Department's M-607-1 standard, before the fence is cut, to prevent slacking of the remaining fence. All materials removed shall be returned to the Department. 28. It shall be the responsibility of the Permittee to maintain adequate sight distance for this driveway. Trimming of vegetation or trees to maintain adequate sight distance is the sole responsibility of the Permittee. 29. The permittee, his or her heirs, successors -in -interest, assigns, and occupants of the property serviced by the access shall be responsible for meeting the terms and conditions of the permit, the repair and maintenance of the access beyond the edge of the roadway including any cattle guard and gate, and the removal or clearance of snow or ice upon the access even though deposited on the access in the course of Department snow removal operations. Within unincorporated areas the Department will keep access culverts clean as part of maintenance of the highway drainage system. However, the permittee is responsible for the repair and replacement of any access -related culverts within the right-of-way. Within incorporated areas, drainage responsibilities for municipalities are determined by statute and local ordinance. The Department will maintain the roadway including auxiliary lanes and shoulders, except in those cases where the access installation has failed due to improper access construction and/or failure to follow permit requirements and specifications in which case the permittee shall be responsible for such repair. Any significant repair such as culvert replacement, resurfacing, or changes in design or specifications, requires authorization from the Department. 30. Any damage to present highway facilities including traffic control devices shall be repaired immediately at no cost to the Department and prior to continuing other work. 31. During access construction, no construction -related, personal vehicles will be permitted to park in the state highway right-of-way. 32. Any mud or other material tracked, or otherwise deposited, on the roadway shall be removed daily or as ordered by the Department inspector. If mud is an obvious condition during site construction, it is recommended that the contractor build a Stabilized Construction Entrance or Scrubber Pad at the intended construction access to aid in the removal of mud and debris from vehicle tires. The details of the Stabilized Construction Entrance can be found in the M Et S Standards Plan No. M-208-1. 33. A fully -executed, complete copy of this permit and the Notice to Proceed must be on the job site with the contractor at all times during the construction. Failure to comply with this or any other construction requirement may result in the immediate suspension of work by order of the Department inspector or the issuing authority. 34. No work will be allowed at night, Saturdays, Sundays and legal holidays without prior authorization from the Department. The Department may also restrict work within the State Highway right-of-way during adverse weather conditions. 35. The access shall be completed in an expeditious and safe manner and shall be completed within 45 days from initiation of construction within State Highway right-of-way or in accordance with written concurrence of the Access Manager. All construction shall be completed in a single season. September 6, 2018 PERMIT No. 318105 Permittee(s): Big R Lot Owners Association Location: Garfield County on CO Highway 006D, near Mile Ref. Pt. 94.6 Left 36. All costs associated with any type of utility work will be at the sole responsibility and cost of the Permittee and at no cost to CDOT. 37. Areas of roadway and/or right-of-way disturbed during this installation shall be restored to their original conditions to insure proper strength and stability, drainage and erosion control. Restoration shall meet the Department's standard specifications for topsoil, fertilization, mulching, and re -seeding. 38. All construction and inspection work must be under the direction of a Colorado Registered Professional Engineer. The PE's responsibilities include, but are not limited to: The PE shall evaluate compliance with plans and specifications with regard to the roadway improvements within the State right-of-way. The PE shall carefully monitor the contractor's compliance on all aspects of construction, including construction zone traffic control. 39. Engineering Certification: After inspection and before final acceptance, the Engineer shall certify to CDOT in writing that all inspections, materials, materials testing, and construction methods conform to the plans, specifications and purpose of design. Upon completion of the work, that responsible Engineer shall submit an "As Built" plans, showing in detail all approved construction changes, modification. Construction Completion Et Final Acceptance 40. The Permittee shall construct all improvements stated on this permit prior to any use as allowed by this permit. The Permittee shall notify the Permit Manager by certified mail within 10 working days to request a final inspection. This request shall include signed and sealed certification that all materials and construction have been completed in accordance with all applicable Department Standards and Specifications; and that the access is constructed in conformance with the State Highway Access Code, 2 CCR 601-1, and the terms and conditions included in this permit. The engineer of record shall be present for this inspection. The access serviced by this permit may not be opened to traffic until the CDOT Access Manager provides written initial approval. 41. Following the final inspection, CDOT will prepare an Access Construction Inspection Summary Letter and send it to the applicant, Permittee, and engineer of record. If additional items are required to complete the access construction, a list of these items will be part of the access construction inspection summary letter. All required items and final as -built survey shall be completed within 30 days from receiving the Access Construction Summary Letter. The access serviced by this permit may not be opened to traffic until written approval has been given from the CDOT Access Manager. If all work appears to have been done in general close conformity with the above named permit, an initial acceptance letter will be sent to the Permittee and this access may be opened for traffic. 42. The 2-year warrantee period will begin when the initial acceptance letter is issued. In accordance with section 2.5(6) of the State Highway Access Code, if any construction element fails within two -years due to improper construction or material specifications, the Permittee shall be responsible for all repairs. Failure to make such repairs may result in suspension of the permit and closure of the access. The letter of final acceptance will be issued once the access has been inspected and is found to comply with all material and construction in accordance with all applicable Department Standards and Specifications approx. 2 years after initial acceptance. COLORADO Department of Transportation What is stormwater runoff? Stormwater runoff occurs when precipitation from rain or snowmelt flows over the ground. Impervious surfaces like roads and sidewalks prevent stormwater from naturally soaking into the ground Why is stormwater runoff a problem? Stormwater can pick up debris, chemicals, dirt and other pollutants and flow into CDOT's storm drain system or directly into a stream, river, lake, wetland or reservoir. Anything that enters CDOT's storm drain system is discharged untreated into the waterways we use for fishing, swimming, and providing drinking water. Dredged spoil, dirt, slurry, solid waste, incinerator residue, sewage, sewage sludge, garbage, trash, chemical waste, biological nutrient, biological material, radioactive material, heat, pH, wrecked or discarded equipment, rock, sand, any industrial, municipal, or agricultural waste. Tips for Reporting an Illicit Discharge Call the illicit discharge hotline at (303) 512-4426 From a safe distance try to estimate the amount of the discharge. Identify characteristics of the discharge (color, odor, algae, etc.). Obtain information on the vehicle dumping the waste (if applicable). Do not approach! Call *CSP for illicit dumping. If possible, take a photo, record a license plate. REMEMBER: Never get too close to the illicit discharge, it may be dangerous!!! For more information on CDOT Utility Permits: https://www.codot.gov/business/permits/utilitie sspecialuse For more information on CDOT Access Permits: https://www.codot.gov/business/permits/access permits For more information on CDOT Water Quality Program: Water Quality Program Manager 4201 E. Arkansas Ave. Shumate Building Denver, Colorado 80222 303-757-9343 COLORADO Department of Transportation Water Quality IDrctram Industrial Facilities IDrc!ram CDOT has a Municipal Separate Storm Sewer System permit, otherwise known as (MS4) from the Colorado Department of Public Health and Environment. The permit states that only stormwater can be discharged from CDOT's storm drain system �f \� storm drain PIPR TO THE WASTEWATER TOTHELOCAL TREATMENT PLANT WATERBOE]Y As part of the permit, CDOT has several different programs to prevent pollutants from entering into the storm drain system: Construction Site Program New Development Redevelopment Program Illicit Discharge Program Industrial Facilities Program Public Education and Outreach Program Pollution Prevention and Good Housekeeping Program Wet Weather Monitoring Program COLORADO Department of Transportation Control Measures for Industrial Facilities Industrial facilities can use control measures (CM) otherwise known as Best Management Practices (BMP) during the construction of a facility and when operating the facility. Control measures are schedules of activities, maintenance procedures, and other management practices to prevent and reduce pollution entering into CDOT's storm drain system. Control Measures also include treatment, operating procedures, and practices to control site run off which can include structural and non-structural controls. THE GAUNTLET . PORETHnHT ANTsa .3" IS THIS THE MINER !NM FOR THEPpLUTANf7 IS THE MAP PROPERLY MAINTAINED? In compliance!! CDOT defines a utility, or utility facility as any privately, publicly, or cooperatively owned line, facility, or system producing, transmitting or distributing the following: ✓ Communications ✓ Cable television ✓ Power ✓ Electricity ✓ Light ✓ Heat Gas ✓ Oil ✓ Crude Products ✓ Water ✓ Stream ✓ Waste ✓ Stormwater not connected with highway drainage ✓ Similar Commodity COLORADO Department of Transportation Industrial Facilities Program Elements: 1. Educate and outreach to owners or operators that have potential to contribute substantial pollutant to water. 2. Report and include information on discharge and water quality concerns. Provide written notification within 15 days of discovery to CDPHE. 3. Submit an annual report to CDPHE containing the number of informational brochures distributed; name and title of each individual trained. Education There are instances when a utility company or other entity doing work in the state highway right-of-way will require some type of environmental permit or clearance for that work. CDOT has put together an Environmental Clearances Information Summary for those applying for a CDOT Utility and Special Use Permit or Access Permit to obtain all required clearances. This fact sheet is given to each permittee and is available at: http://www.coloradodotinfo/programs/ environmental/ resources/guidance- standards/Environmental%20Clearances% 20lnfo%20Summary.pdf COLORADO DEPARTMENT OF TRANSPORTATION Environmental Clearances Information Summary PURPOSE - This summary is intended to inform entities external to CDOT that may be entering the state highway right-of-way to perform work related to their own facilities (such as Utility, Special Use or Access Permittees), about some of the more commonly encountered environmental permits/clearances that may apply to their activities. This listing is not all-inclusive - additional environmental or cultural resource permits/clearances may be required in certain instances. Appropriate local, state and federal agencies should be contacted for additional information if there is any uncertainty about what permits/clearances are required for a specific activity. IMPORTANT — Please Review The Following Information Carefully — Failure to Comply With Regulatory Requirements May Result In Suspension or Revocation of Your CDOT Permit, Or Enforcement Actions By Other Agencies CLEARANCE CONTACTS - As indicated in the permit/clearance descriptions listed below, the following individuals or agencies may be contacted for additional information: • Colorado Department of Public Health and Environment (CDPHE): General Information — (303) 692-2035 Water Quality Control Division (WQCD): (303) 692-3500 Environmental Permitting Website https://www.colorado.gov/pacific/cdphe/all-permits • CDOT Water Quality Program Manager: (303) 757-9343 https://www.codot.gov/programs/environmental/water-quality • CDOT Asbestos Project Manager: Phil Kangas, (303) 512-5519 • Colorado Office of Archaeology and Historic Preservation: (303) 866-3395 • U.S. Army Corps of Engineers, District Regulatory Offices: Omaha District (NE CO), Denver Office (303) 979-4120 http://www. nwo. usace.army.mil/Missions/Reg ulatoryProgram/Colorado.aspx Sacramento Dist. (Western CO), Grand Junction Office (970) 243-1199 http://www.spk.usace.army.mil/Missions/Regulatory.aspx Albuquerque District (SE CO), Pueblo Office (719)-543-9459 http://www.spa. usace.army.mil/Missions/RegulatoryProgramand Permits.aspx • CDOT Utilities, Special Use and Access Permitting: (303) 757-9654 https://www.codot.gov/business/permits Wildlife Resources - Disturbance of wildlife shall be avoided to the maximum extent practicable. Entry into areas of known or suspected threatened or endangered species habitat will require special authorization from the CDOT permitting office. If any threatened or endangered species are encountered during the progress of the permitted work, work in the subject area shall be halted and the CDOT Regional Permitting Office and Region Planning and Environmental Manager shall be contacted immediately. Authorization must be provided by CDOT prior to the continuation of work. Information about threatened or endangered species may be obtained from the CDOT website, http://www.codot.gov/programs/environmental/wildlife/guidelines, or the Colorado Parks and Wildlife (CPW) website, http://www.cpw.state.co.us/learn/Pages/SOC-ThreatenedEndangeredList.aspx. Additional guidance may be provided by the appropriate Region Planning and Environmental Manager (RPEM). Cultural Resources - The applicant must request a file search of the permit area through the Colorado Office of Archaeology and Historic Preservation (OAHP), Denver, to ascertain if historic or archaeological resources have previously been identified (http://www.historycolorado.orq/oahp/file-search). Inventory of the permit area by a qualified cultural resources specialist may be necessary, per the recommendation of CDOT. If archaeological sites/artifacts or historic resources are known to exist prior to the initiation of the permitted work or are encountered as the project progresses, all work in the subject area shall be halted and the CDOT Regional Permitting Office and Region Planning and Environmental Manager shall be contacted immediately. Authorization must be provided by CDOT prior to the continuation of work. Additional guidance may be provided by the Regional Permitting Office and RPEM. Contact Information: Contact the OAHP for file searches at (303) 866-3395. Paleontological Resources - The applicant must request a fossil locality file search through the University of Colorado Museum, Boulder (https://cumuseum.colorado.edu/research/paleontology/vertebrates/policies), and the Denver Museum of Nature and Science (http://www.dmns.org/science/collections/earth-science-collections/) to ascertain if paleontological resources have been previously identified in or near the permit area. Inventory of the permit area by a qualified paleontologist may be necessary, per the recommendation of CDOT. If fossils are encountered during the permitted work, all work in the subject area shall be halted and the CDOT Regional Permitting Office and Region Planning and Environmental Manager shall be contacted immediately. Authorization must be provided by CDOT prior to the continuation of work. Additional guidance may be provided by the Regional Permitting Office in the Permit Special Provisions. Contact Information: See the museum websites listed above for Paleontological Collections Manager contact information. Contact the CDOT Paleontologist for further information at nicole.peavey@state.co.us or (303) 757- 9632. The CDOT Paleontologist will not conduct a comprehensive file search independently of the museums. Hazardous Materials, Solid Waste - The Solid Wastes Disposal Sites and Facilities Act C.R.S. 30-20-100, et al, and Regulations Pertaining to Solid Waste Disposal Sites and Facilities (6 CCR 1007-2), prohibit solid waste disposal without an approved Certificate of Designation (a landfill permit). The Colorado Hazardous Waste Act C.R.S. 25-15-301 et al, and the Colorado Hazardous Waste Regulations (6 CCR 1007-3) prohibit the transfer, storage or disposal (TSD) of hazardous waste except at permitted TSD sites. There are no permitted landfills or TSD sites within the State Highway Right of Way. Therefore, all solid or hazardous wastes that might be generated by the activities of entities entering the State Highway Right of Way must be removed from the ROW and disposed of at a permitted facility or designated collection point (e.g., for solid waste, a utility or construction company's own dumpster). If pre-existing solid waste or hazardous materials contamination (including oil or petroleum contaminated soil, asbestos, chemicals, mine tailings, etc.) is encountered during the performance of work, the permittee shall halt work in the affected area and immediately contact the CDOT Regional Permitting Office for direction as to how to proceed. Contact Information: Theresa Santangelo-Dreiling, CDOT Hazardous Materials Project Manager, (303) 512-5524, or Andy Flurkey, (303) 512-5520. Asbestos Containing Materials, Asbestos Contaminated Soil - All work on asbestos containing materials (ACM) must comply with the applicable requirements of the CDPHE Air Pollution Control Division's (APCD) Regulation 8. Disposal of ACM, and work done in asbestos -contaminated soil, must comply with the CDPHE Hazardous Materials and Waste Management Division's (HMWMD) Solid Environmental Clearances Information Summary Page 1 of 3 Colorado Department of Transportation May '16 Waste Regulations. The application for any CDOT permit must specifically identify any ACM involved in the work for which authorization is being requested. Additional guidance or requirements may be specified in the permit special provisions. Contact Info: CDPHE APCD and HMWMD Regulations can be accessed via the CDPHE Environmental Permitting Website listed above. Additional information concerning clearance on CDOT projects is available from the CDOT Asbestos Project Manager (303) 512- 5519, or Theresa Santangelo-Dreiling, Hazardous Materials Management Supervisor (303) 512-5524. Transportation of Hazardous Materials - No person may offer or accept a hazardous material for transportation in commerce unless that person is registered in conformance with the United States Department of Transportation regulations at 49 CFR, Part 171. The hazardous material must be properly classed, described, packaged, marked, labeled, and in condition for shipment as required or authorized by applicable requirements, or an exemption, approval or registration has been issued. Vehicles requiring a placard, must obtain authorization and a State HAZMAT Permit from the Colorado Public Utilities Commission. Contact Information: For authorization and more info call the Federal Motor Safety Carrier Administration, US DOT for inter- and intra-state HAZMAT Registration (303) 969-6748. Colorado Public Utilities Commission: (303) 894-2868. _ Discharge of Dredged or Fill Material — 404 Permits Administered By the U.S. Army Corps of Engineers, and Section 401 Water Quality Certifications Issued by the CDPHE WQCD - Corps of Engineers 404 permits are required for the discharge of dredged or fill materials into waters of the United States, including wetlands. There are various types of 404 permits, including nationwide permits, which are issued for activities with relatively minor impacts. For example, there is a nationwide permit for utility line activities (nwp #12). Depending upon the specific circumstances, it is possible that either a "general" or "individual" 404 permit would be required. If an individual 404 permit is required, section 401 water quality certification from the CDPHE WQCD is also required. Contact the appropriate Corps District Regulatory Office for information about what type of 404 permit may be required (contact information above). Contact the CDPHE Water Quality Control Division at (303) 692-3500. Working on or in any stream or its bank - In order to protect and preserve the state's fish and wildlife resources from actions that may obstruct, diminish, destroy, change, modify, or vary a natural existing stream or its banks or tributaries, it may be necessary to obtain a Senate Bill 40 certification from the Colorado Department of Natural Resources. A stream is defined as 1) represented by a solid blue line on USGS 7.5' quadrangle maps; and/or 2) intermittent streams providing live water beneficial to fish and wildlife; and/or 3) segments of streams supporting 25% or more cover within 100 yards upstream or downstream of the project; and/or 4) segments of streams having wetlands present within 200 yards upstream or downstream of the project measured by valley length. The CPW application, as per guidelines agreed upon by CDOT and CPW, can be accessed at http://www.coloradodot.info/programs/environmental/wildlife/guidelines. Stormwater Construction Permit (SCP) and Stormwater Discharge From Industrial Facilities - Discharges of stormwater runoff from construction sites disturbing one acre or more - or certain types of industrial facilities, such as concrete batch plants - requires a CDPS Stormwater Permit. Contact Information: Contact the CDPHE Water Quality Control Division at (303) 692-3500. Website: https://www.colorado.gov/pacific/cdphe/wq-construction-general-permits and https://colorado.gov/pacific/cdphe/wq-commerce-and- industry-permits. Construction Dewatering (Discharge or Infiltration) and Remediation Activities - Discharges of water encountered during excavation or work in wet areas may require a Construction Dewatering or Remediation Activities Discharge Permit. Contact Information: For Construction Dewatering and Remediation Activities Discharge Permits, contact the CDPHE WQCD at (303) 692- 3500. For Applications and Instructions (CDPHE website): https://www.colorado.gov/pacific/cdphe/wq-construction-general-permits. Municipal Separate Storm Sewer System (MS4) Discharge Permit - Discharges from the storm sewer systems of larger municipalities, and from the CDOT highway drainage system that lies within those municipalities, are subject to MS4 Permits issued by the CDPHE WQCD. For facilities that lie within the boundaries of a municipality that is subject to an MS4 permit, the owner of such facility should contact the municipality regarding stormwater related clearances that may have been established under that municipality's MS4 permit. All discharges to the CDOT highway drainage system or within the Right of Way (ROW) must comply with the applicable provisions of the Colorado Water Quality Control Act, the Water Quality Control Commission (WQCC) Regulations (https://www.colorado.gov/pacific/cdphe/wqcc-regulations-and-policies-and-water-quality-statutes) and the CDOT MS4 Permit # COS- 000005 (https://www.codot.gov/programs/environmental/water-quality/documents). Discharges are subject to inspection by CDOT and CDPHE. Contact the CDPHE Water Quality Control Division at (303) 692-3500 for a listing of municipalities required to obtain MS4 Permits, or go to https://www.colorado.gov/pacific/cdphe/wq-municipal-ms4-permits. General Prohibition — Discharges - All discharges are subject to the provisions of the Colorado Water Quality Control Act and the Colorado Discharge Permit Regulations. Prohibited discharges include, but are not limited to, substances such as wash water, paint, automotive fluids, solvents, oils or soaps and sediment. Contact Information: Contact the CDPHE Water Quality Control Division at (303) 692-3500. General Authorization - Allowable Non-Stormwater Discharges - Unless otherwise identified by CDOT or the WQCD as significant sources of pollutants to the waters of the State, the following discharges to stormwater systems are allowed without a Colorado Discharge Permit System permit: landscape irrigation, diverted stream flows, uncontaminated ground water infiltration to separate storm sewers, discharges from potable water sources, foundation drains, air conditioning condensation, irrigation water, uncontaminated springs, footing drains, water line flushing, flows from riparian habitats and wetlands, and flow from firefighting activities. Allowable non-stormwater discharges can be found at https://www.codot.gov/programs/environmental/water- quality/glossary.html. Contact Information: The CDPHE Water Quality Control Division (telephone #'s listed above). Erosion and Sediment Control Practices - For activities requiring a Stormwater Construction Permit, erosion control requirements will be specified in that permit. In those situations where a stormwater permit is not required, all reasonable measures should be taken in order to minimize erosion and sedimentation according to CDOT Standard Specifications 107.25 and 208. All disturbances require a stabilization plan, native seeding or landscape design plan according to applicable CDOT Standard Specifications 212-217 and 623. In any case, the CDOT Erosion Control and Stormwater Quality Guide (most recent version) should be used to design erosion controls and to restore disturbed vegetation. Contact Information: The CDOT Erosion Control and Stormwater Quality Guide may be obtained from the Bid Plans Office at (303) 757-9313 or from: https://www.codot.gov/programs/environmental/landscape- architecture/erosion-storm-quality. Environmental Clearances Information Summary Page 2 of 3 Colorado Department of Transportation May '16 Disposal of Drilling Fluids - Drilling fluids used in operations such as Horizontal Directional Drilling may be classified as "discharges" or "solid wastes," and in general, should be pumped or vacuumed from the construction area, removed from the State Highway Right of Way, and disposed of at permitted facilities that specifically accept such wastes. Disposal of drilling fluids into storm drains, storm sewers, roadside ditches or any other type of man-made or natural waterway is prohibited by Water Quality Control and/or Solid Waste regulations. Small quantities of drilling fluid solids (less than 1 cubic yard of solids) may be left on -site after either being separated from fluids or after infiltration of the water, provided: 1) the drilling fluid consists of only water and bentonite clay, or, if required for proper drilling properties, small quantities of polymer additives that are approved for use in drinking water well drilling; 2) the solids are fully contained in a pit, and are not likely to pose a nuisance to future work in the area, 3) the solids are covered and the area restored as required by CDOT permit requirements (Utility, Special Use, or Access Permits, etc.). Contact Information: Contact CDPHE (telephone #'s listed above). Noxious Weeds and Invasive Species Management Plan — Noxious Weeds and Invasive Species guidance can be found by contacting the Colorado Department of Agriculture (https://www.colorado.gov/pacific/agconservation/noxiousweeds) and the Colorado Division of Parks and Wildlife (http://cpw.state.co.us/aboutus/Pages/RS-NoxiousWeeds.aspx). In either case, management plans involving the control of noxious weeds associated with the permitted activity and cleaning of equipment will be required. Concrete Washout - Waste generated from concrete activities shall NOT be allowed to flow into the drainage ways, inlets, receiving waters, or in the CDOT ROW. Concrete waste shall be placed in a temporary concrete washout facility and must be located a minimum of 50 feet from state waters, drainageways, and inlets. Concrete washout shall only be performed as specified by the CDOT Environmental Program and shall be in accordance to CDOT specifications and guidelines. Contact Information: Contact CDPHE or find additional information on the CDOT website: https://www.codot.gov/business/designsupport/2011-construction- pecifications/2011-Specs and refer to the specifications and their revisions for sections 101, 107 and 208. Spill Reporting - Spills shall be contained and cleaned up as soon as possible. Spills shall NOT be washed down into the storm drain or buried. All spills shall be reported to the CDOT Illicit Discharge Hotline at (303) 512-4446 (4H20), as well as the Regional Permitting Office and Regional Maintenance Supervisor. Spills on highways, into waterways, any spill in the highway right-of-way exceeding 25 gallons, or that may otherwise present an immediate danger to the public shall be reported by calling 911, and shall also be reported to the CDPHE at 1-877-518-5608. More information can be found at https://www.colorado.gov/pacific/cdphe/emergency- reportinq-line. _ About This Form - Questions or comments about this Information Summary may be directed to Alex Karami, Program Administrator, CDOT Access Management Unit, at (303) 757-9841, alex.karami@state.co.us. Environmental Clearances Information Summary Page 3 of 3 Colorado Department of Transportation May '16