PRE -APPLICATION
CONFERENCE
SUMMARY
PARCEL NUMBER: 2391-321-00-043
PROJECT: 17352 Highway 82 Professional Office
OWNERS: RFLANDCO LLC
REPRESENTATIVE: Jack Albright
PRACTICAL LOCATION: Approximately 5 miles east of the Town of Carbondale at 17352
Highway 82.
ZONING: Rural (R)
TYPE OF APPLICATION: Limited Impact Review for Professional Office in Rural Zone
DATE: Updated 11-10-20
I. GENERAL PROJECT DESCRIPTION
The applicant originally proposed the conversion of an existing accessory dwelling into a
Home Office/Business as a Permitted use within the Rural zone district. The Garfield
County Land Use & Development Code (LUDC) provides very specific criteria for the
operation of a Home Office/Business, see Section 7-702. In discussions with the applicant
it has become clear that the proposed use of the property as a Home Office/Business
would not meet the limitations of Section 7-702. An alternative to the Home Office/Business
as a Permitted use is the possibility of requesting a Land Use Change Permit for a
Professional Office on this property. Table 3-403 Use Table defines Professional Office
under the Commercial Uses in the Rural zone district as a use requiring a Limited Impact
Review. The Limited Impact Review is processed according to the requirements defined in
Sections 4-101. Common Review Procedures; 4-104. Limited Impact Review; and 4-203.
Description of Submittal Requirements.
The Planning staff have not been able to locate records of past approval for the existing
Accessory Dwelling Unit. At this point in time, the County is considering it a use by right
and not an issue.
The applicant has stated that his partner also additional uses and businesses on the
property. Additionally, the applicant stated that since acquiring the property they have
undertake significant clean up of the property.
Please note that Section 4-104. C. Review Criteria for the Limited Impact Review requires
compliance with applicable standards of the LUDC. This would mean that all existing uses
and improvements will be required to be in compliance with such things as the Rural zone
district standards prior to approving a Limited Impact Review permit.
II. COMPREHENSIVE PLAN
The Garfield County Comprehensive Plan Future Land Use 2030 designates this property
Residential Low (10+Ac/DU).
III. REGULATORY PROVISIONS APPLICANT IS REQURED TO ADDRESS
• Article 3, Zoning
o Rural Zone District — Lot/Building Requirements (Table 3-201) and Use Table
(Table 3-403)
• Article 4, Application and Review Procedures
o Limited Impact Review Process (Section 4-104)
o Common Review Procedures (Section 4-101)
o Table 4-102 Common Review Procedures and Required Notice
o Application Materials (Table 4-201 and Section 4-203)
• Article 7, Standards — Division 1 General Standards, Division 2 General Resource
Protection Standards, Division 3 Site Planning — as applicable and Section 7-1001
Industrial Use
IV. SUBMITTAL REQUIREMENTS
Please refer directly to Table 4-201 and the list of General Application Materials in section 4-
203. Outlined below is a list of information typically required for the Limited Impact Review
application. These components must be submitted.
• 4-203.B. General Application Materials
o Completed Application Form
o Completed Payment Agreement Form and application fees
o Proof of Ownership (title work, copy of the deed)
o If owner intends to have a representative, both a statement of authority for the
LLC and a letter of authorization to represent is needed.
o Names and mailing addresses of properties within 200 ft. of the subject
property.
o Mineral rights ownership for the subject property (demonstrated through a
search of Clerk and Recorders database and/or Assessors database, form
and memo attached).
o A narrative describing the request and related information.
o Copy of this pre -application summary
• 4-203.C. Vicinity map within a radius of approximately 3 miles
• 4-203.D. Site Plan
• 4-203.E. Grading and Drainage Plan
2
• 4-203.F. Landscaping Plan — As industrial uses are exempt from Landscaping Plans,
a waiver may be requested from this requirement.
• 4-203.G. Impact Analysis — Descriptive information should be provided including
information on environmental impacts, nuisance and hours of operation.
• 4-203.J, K — Development Agreement / Improvements Agreement (may be waived
upon request as these agreements are typically not applicable where there are no
vesting issues and no public improvements).
• 4-203.L. Traffic Study — Basic Traffic Study will be required.
• 4-203.M. Water Supply/Distribution Plan
o The Applicant will need to demonstrate that there is a legal and adequate
water supply for all uses it is serving.
• 4-203.N. Wastewater Treatment Plan
o The applicant will need to demonstrate that the septic is legal and adequate
for all uses it is serving.
• Respond to Standards fully described in Article 7, Divisions 1, 2 and 3 as applicable
and Section 1001 Industrial Use.
V. WAIVER REQUESTS
Should the Applicant choose to request waivers from submittal requirements or standards,
the Application submittal will need to clearly address the review criteria contained in
Sections 4-118 and 4-202 in justifying the requests. Where technical issues are concerned
(i.e. roadway standards, traffic, drainage, erosion control) the Application needs to
demonstrate that the issues are adequately addressed so that the waiver criteria are being
met. Technical expertise and engineering reports may still be required to support the waiver
request. Further pre -application meetings are recommended to discuss potential waiver
requests with Staff prior to finalizing the Application submittals.
Submit three paper copies and one digital of application. Additional copies will be
requested upon determination of completeness. See the land use code for additional
information on submittal requirements.
V. APPLICATION REVIEW
a. Review by: Staff for completeness recommendation and referral agencies for
additional technical review
b. Public Hearing:
_None (Director's Decision)
_Planning Commission
X Board of County Commissioners
Board of Adjustment
c. Referral Agencies: May include Garfield County Road and Bridge Department, Fire
Protection District, Garfield County Designated Engineer,
Garfield County Vegetation Management, Colorado Parks and
Wildlife, Division of Water Resources and more.
3
VI. APPLICATION REVIEW FEES
a. Planning Review Fees: $ 400.00 (each)
b. Referral Agency Fees: $ TBD — consulting engineer/civil engineer fees
c. Total Deposit: $ 400.00 each (additional hours are billed at
$40.50 /hour
VII. GENERAL APPLICATION PROCESSING
The foregoing summary is advisory in nature only and is not binding on the County. The
summary is based on current zoning, which is subject to change in the future, and upon
factual representations that may or may not be accurate. This summary does not create a
legal or vested right. The summary is valid for a six-month period, after which an update
should be requested. The Applicant is advised that the Application submittal once accepted
by the County becomes public information and will be available (including electronically) for
review by the public. Proprietary information can be redacted from documents prior to
submittal.
Pre -application Summary Prepared by:
11/10/20
Vincent Hooper, PMP Date
Planner III
4
Approximately 3 months if submittal is complete
re. Garfield County
Limited Impact Review Process
(Section 4-104)
Step 1: Pre -application Conference
• Applicant has 6 months to submit application
Step 2: Application Submittal
Step 3: Completeness Review
• 20 business days to review
• If incomplete, 60 days to remedy deficiencies
Step 4: Schedule Hearing and Provide Notice
•Published, posted, and mailed to adjacent property owners within 200
feet and mineral owners at least 30 days but no more than 60 days prior
to BOCC public hearing
Step 5: Referral
•21 day comment period
Step 6: Evalution by Director
Step 7: BOCC Decision
•Applicant has 1 year to meet any conditions of approval
5