Loading...
HomeMy WebLinkAbout3.04 Water Supply and Management Plan BJU N23-496 Central Delivery Point Administrative Review Caerus Piceance LLC Garfield County, Colorado 1001 17th Street, Suite 1600 2022 Denver, CO 80202 BJU N23-496 Central Delivery Point Article 4 Section 203.M. Water Supply and Management Plan Water Supply and Management Plan Narrative The Water Management Plan, Section 4-203(M) of the Garfield County Land Use and Development Code is not applicable to the proposed site or use. The proposed central delivery point (CDP) will not require water for personnel or water to be supplied to the site for daily operations. During construction of the facility (30 days), interim reclamation (10 days), and initial production phases the site will be access daily. After production operations are fully established, the site will only be access 2-3 times a week. Due to the minimal presence of personnel onsite, a wastewater use will not be required onsite Drinking water will be provided in the form of bottled water. Due to the minimal presence of personnel onsite, water use will not be required onsite. Throughout the Parachute Ranch operations area, fresh water is utilized for dust mitigation. Caerus will adhere to COGCC standards regarding dust. Fresh water for dust mitigation will not be obtained from within the site perimeter.