Loading...
HomeMy WebLinkAbout4.04 N23 CDP Pad Construction Design and Calculations CONSTRUCTION DESIGN AND CALCULATIONS CAERUS OIL & GAS LLC U INTAH E NGINEERING & L AND S URVEYING U INTAH E NGINEERING & L AND S URVEYING 1 1 CAERUS OIL & GAS LLC 1001 17th St #1600 Denver, Colorado 80202 1/7/2022 RE: BJU N23 496 CDP PAD CONSTRUCTION DESIGN AND CALCULATIONS SCOPE OF WORK UELS, LLC has analyzed the CDP pad for the BJU N23 496 CDP Pad. The pad was designed to drain to the west and to the east. Detention ponds were designed for each side using the 25 year/24-hour precipitation which is approximately 3,600 ft3 per acre of contributing drainage area, please see table below. Pond Location Contributing Area (Acre) Freeboard Actual Volume (ft3) Required Volume (ft3) Pond #1 1.1 0.5’ 3,226 3,960 Pond #2 0.36 0.5’ 1,011 1,296 Please let me know if you have any questions. Respectfully, Sterling Walker, PE UELS, LLC (435) 789-1017 UELS, LLC Corporate Office * 85 South 200 East Vernal, UT 84078 * (435) 789-1017 ENGINEERING & LAND SURVEYING NOTES: ·Contours shown at 2' intervals. POND LOCATIONS SURVEYED BY DRAWN BY SCALE 1" = 60'S.L.W.01-07-22 Caerus Oil & Gas LLC D.S.12-17-21 BJU N23 496 CDP PAD SE 1/4 SW 1/4, SECTION 23, T4S, R96W, 6th P.M. NE 1/4 NW 1/4, SECTION 26, T4S, R96W, 6th P.M. GARFIELD COUNTY, COLORADO Pond #1 Location Pond #2 Location