Loading...
HomeMy WebLinkAbout4.08 SW BMP FigureBJU N23 CDP 496 Construction Control Measure Narrative:Temporary Stabilization efforts have been employed on this disturbance. Perimeter TopsoilBermshave been stabilized with Mulch. Perimeter Run-off controls includes Diversions/Berms .Wattles act as a tertiary BMP atthe toe of the fill slope.Culverts and Roadside Ditches direct water across the access road. Cut/Fill slopes fall under thealternative stabilization schedule and utilize perimeter controls until long term stabilization can occur. The Construction SiteBoundaryfalls within the Permitted Disturbance. Unless otherwise noted, all areas within the construction boundary will bedisturbed. Additional details are depicted above. Legend SW Direction ofFlow Armoring Culvert Diversion Roadside Ditch Cut Fill Berm Sediment Trap Wattle Top-soil Mulching Graveled Stabilized Surface .