August 10, 2021
Daniel Stewart
RE: Half Moon Subdivision – NorthStar Trail Battlement Mesa, CO
Dear Mr. Stewart,
The above-mentioned project is within the certified service area of Holy Cross Energy.
Holy Cross Energy has adequate power supply to provide electric power to the development, subject to tariffs,
rules and regulations on file. Any power line enlargements, relocations, and new extensions necessary to deliver
adequate power to and within the development will be undertaken by Holy Cross Energy upon completion of
appropriate contractual agreements and subject to necessary governmental approvals.
Sincerely,
HOLY CROSS ENERGY
Luke Pagni,
Engineer I
lpagni@holycross.com
(970) 947-5524
Version March 9, 2021
WILL SERVE LETTER
August 11, 2021
Danny Stewart
592 Highway 133
Carbondale CO 81623
Re: Half Moon Subdivision
Dear Mr. Stewart,
This letter is to confirm that Xcel Energy is your utility provider for natural gas. In accordance with our tariffs, on
file with and approved by the Colorado Public Utilities Commission, gas facilities can be made available to serve the
project at Northstar Tr . The cost, and whether any reinforcements or extensions are required, for the Company to
provide those facilities will be determined by your designer upon receipt of application and project plans.
Your utility service(s) will be provided after the following steps are completed:
• Application submitted to Xcel Energy’s “Builders Call Line (BCL)” – once your application is
accepted you will be assigned a design department representative who will be your primary point of contact
• Utility design is completed – you must provide your design representative with the site plan, the one -
line diagrams, and panel schedules for electric and gas loads if applicable
• All documents provided by design representative are signed and returned
• Payment is received (Residential Service Laterals if applicable)
• Required easements are granted - you must sign and return applicable easement documents to your
Right-of-Way agent
• Site is ready for utility construction - the site ready information can be found on our website at may be
viewed at Construction and Inspection | Xcel Energy.
An estimated scheduled in-service date will be provided once these requirements have been met. It is important to
keep in mind that the terms and conditions of utility service, per our tariffs, require that you provide adequate
space and an easement on your property for all gas and electric facilities required to serve your project, including
but not limited to gas and electrical lines and meters, transformers, and pedestals. General guidelines for
requirements can be found on our website at xcelenergy.com/InstallAndConnect.
Xcel Energy looks forward to working with you on your project and if I can be of further assistance, please contact
me at the phone number or email listed below.
Sincerely,
Samantha Wakefield
Xcel Energy Planner