HomeMy WebLinkAbout1.00 General Application Materials_PartFTABLE OF CONTENTS
PURPOSE AND SCOPE OF STUDY 1
PROPOSED DEVELOPMENT 1
SITE CONDITIONS 2
GEOLOGIC SETTING 2
LOESS 3
COLLUVIUM 3
LANDSLIDE 3
BASALT FLOWS 3
EAGLE VALLEY EVAPORITE 4
FAULTS 4
FIELD EXPLORATION 5
SUBSURFACE CONDITIONS 5
GEOLOGIC SITE ASSESSMENT 6
LANDSLIDES AND SLOPE INSTABILITY 6
EARTHQUAKES 6
GYPSUM DEFORMATION 7
PRELIMINARY DESIGN RECOMMENDATIONS 7
FOUNDATIONS 8
FLOOR SLABS 8
UNDERDRAIN SYSTEM 8
SITE GRADING 9
SURFACE DRAINAGE 9
PERCOLATION TESTS 10
LIMITATIONS 10
REFERENCES 11
FIGURE 1 - GEOLOGIC CONDITIONS AND LOCATION OF EXPLORATORY
PITS
FIGURE 2 - LOGS OF EXPLORATORY PITS
FIGURES 3, 4 & 5 - SWELL -CONSOLIDATION TEST RESULTS
FIGURES 6 & 7 - GRADATION TEST RESULTS
TABLE I - SUMMARY OF LABORATORY TEST RESULTS
TABLE II - PERCOLATION TEST RESULTS
PURPOSE AND SCOPE OF STUDY
This report presents the results of a preliminary geotechnical study for the
proposed Levitt Subdivision to be located south of Fender Lane and west of Harmony
Lane in Garfield County, Colorado. The project site is shown on Fig. 1. The purpose
of the study was to identify the geologic and subsurface conditions and evaluate their
impact on the project. The study was conducted in accordance with our proposal for
geotechnical engineering services to Thomas Levitt, dated October 23, 1995.
A field exploration program consisting of a reconnaissance and exploratory pits
was conducted to obtain information on the site and subsurface conditions. Samples
obtained during the field exploration were tested in the laboratory to determine
compressibility or swell and other engineering characteristics of the on-site soils. The
results of the field exploration and laboratory testing were analyzed to develop
recommendations for project planning and preliminary design. This report summarizes
the data obtained during this study and presents our conclusions and recommendations
based on the proposed development.
PROPOSED DEVELOPMENT
The proposed development consists of about 76 acres and will be divided into 13
lots of 4 to 9 acres for single family residences as shown on Fig. 1. Private driveways
will access the building sites. We assume the residences will be typical of the area and
be 2 to 3 stories with a partial or full basement. The development will be serviced with
individual septic disposal systems and a central water system. We understand that
development will be confined to the flatter areas of the site and the steep slope areas
will be avoided.
If development plans change significantly from those described, we should be
notified to reevaluate the recommendations presented in this report.
2
SITE CONDITIONS
The proposed 76 acre Levitt Subdivision is in the Missouri Heights area which is a
rolling upland in eastern Garfield County. The property is in parts of Sec. 28, 29„ =rand
T. 7 S., R. 87 W. The topography in the area is indicated by the contour lines shown
on Fig. I. Most of the northern part of the subdivision is on the Missouri Heights upland
and lies about 600 feet above the Roaring Fork River valley which borders the property on
the south. Portions of the property extend on to the steep, south and west facing
escarpment which forms the river valley side in this area. Slopes on the upland are
moderate, in the range of 5 to 20%. Slopes along the bordering escarpment are steep and
average about 60%. Major drainages do not cross through the property. Several small
ephemeral, first order drainages head on the escarpment that borders the upland. The
upland area has been irrigated and the ditches are stt presen . n e non -irrigated areas
along the escarpment and in a few places on the upland vegetation is sage, other brush and
junipers. The property was undeveloped at the time of our field work in November, 1995.
Road construction was underway in an adjacent development to the north. Several old
ranches and new residences are present in the adjacent parts of the upland.
GEOLOGIC SETTING
The rolling upland on the property is part of a large basalt plateau to the north of
the Roaring Fork River valley. The plateau is on the southern margin of the White River
Uplift which is a broad, regional uplift formed during the Laramide Orogeny about 40 to
70 million years ago. The northwest trending axis of the Roaring Fork Syncline, a
secondary Laramide-age structure, projects through the project area. Near surface rock
formations below the plateau and property are late Miocene -age basalt flows and
interlayered tuffs and volcanic conglomerates. The basalt flows overlie the
H -P GEOTECH
3
Pennsylvanian -a egEagle_Valley Evaporite. Surficial soils are loess and colluvium. The
principle geologic features on the property are shown on Fig. 1.
LOESS
The surface of the upland is underlain by loess (Ql). This wind deposited soil is a
reddish -brown silt and clay with some fine sand. Loess was encountered in most of the
test pits where it was from 3. 5 to greater than 8.5 feet thick. At depth, the loess grades
into weathered basalt.
COLLUVIUM
Colluvium (Qc) usually covers the rock formations on the escarpments which
borders the upland. The colluvium consists of angular to rounded hard rocks, which
ranges from gravel to boulder -size, in a silty to clayey sand matrix. Exploratory pits were
not located in areas of colluvium since extensive development is probably not feasible on
the steep slopes. In most areas the colluvium probably does not exceed 15 feet thick.
LANDSLIDE
An area of irregular topography on the escarpment in the southwestern part of the
property appears to be associated with a deep, rotational slump landslide complex (Qls).
The landslide complex has a surface area of about 7 acres. It appears that the landslide is
in the colluvium, basalt, and underlying Eagle Valley Evaporite. The depth of the landslide
is uncertain, but it could be 50 to 100 feet deep. The landslide appears to be dormant.
BASALT FLOWS
Erosionally resistant basalt flows and interstratified sedimentary rock (Tbb) are
present below the upland, and crop out locally along the escarpment. Near surface
weahem basalt was encountered in several of the exploratory pits. Th weathered basalt
in a sandysiltam It is likely thatconsistsofgraveltoboulder -size basalt fragments
H -P GEOTECH
4 -
weathered basalt which grades at depth to sound basalt will be encountered at typical
basement depth below the upland on the property. a asap flows erupted about 8
million years ago and covered much of the area before the Roaring Fork River and its local
tributaries had down cut to their present levels. The basalt is made up of individual flow
sheets which vary from 5 to 200 feet thick (Larson and Others, 1975). Judging from the
outcrop pattern on the escarpment, basalt flows and possibly interstratified sedimentary
rock at the subdivision may be in the range of 50 to 200 feet thick. The basalt is a very
hard, dense rock which is usually cut by a complex joint system. The interstratified tuffs
and conglomerates are usually non-cemented but firm.
CAV -,641-‘ 41,-/ b)
6", 0 ( go fc,
ar6c
EAGLE VALLEY EVAPORITE tied 15 1) i 5 U s Ey
The Eagle Valley Evaporite crops out locally in gullies below the basalt flows along
the steep escarpment which borders the upland on the south and west. The Eagle Valley
Evaporite is a gray and tan, gypsum and anhydrite with interbedded siltstone, claystone,
and dolomite. The gypsum and anhydrite are cemented but soluble in fresh water. The
siltstone varies from cemented and hard to non-cemented but firm. The dolomite is
cemented and hard. The bedding structure at most places is convoluted because of flow
deformation in the plastic gypsum and anhydrite. Joints are common in the siltstone and
dolomite which gives these rocks a secondary blocky structure. The gypsum and anhydrite
are massive because of their plasticity and they do not contain joints.
FAULTS
Major faults have not been mapped on the property (Tweto and Others, 1978).
The Castle Creek fault zone is located along the lower western slope of Basalt Mountain
about one mile to the east of the eastern property boundary. The Castle Creek fault zone
is not considered to be a potentially active geologic structure (Kirkham and Rogers, 1981).
H -P GEOTECH
5
FIELD EXPLORATION
The field exploration for the project was conducted on November 20, 1995.
Eight exploratory pits were excavated at the locations shown on Fig. 1 to evaluate the
subsurface conditions. The pits were dug with a four-wheel drive rubber -tired backhoe.
The pits were logged by a representative of Hepworth-Pawlak Geotechnical, Inc.
Samples of the subsoils were taken with relatively undisturbed and disturbed
sampling methods. Depths at which the samples were taken are shown on the Logs of
Exploratory Pits, Fig. 2. The samples were returned to our laboratory for review by
the project engineer and testing.
SUBSURFACE CONDITIONS
Graphic logs of the subsurface conditions encountered at the site are shown on
Fig. 2. The subsoils consist of about 'h to 1 'h feet of topsoil overlying up to 8 feet of
stiff sandy silts and clays. In four pits, the silts and clays were underlain by silty sand
and gravel with basalt fragments up to boulder size at depths of 1 to 3 'h feet. Digging
in the dense gravel with the backhoe was difficult due to the cobbles and boulders and
practical refusal was encountered in the deposit.
Laboratory testing performed on samples obtained from the pits included natural
moisture content and density, Atterberg limits, and gradation analyses. Results of
consolidation testing performed on relatively undisturbed drive samples, presented on
Figs. 3 through 5, indicate low to moderate compressibility under conditions of loading
and wetting. Results of gradation analyses performed on disturbed bulk samples (minus
5 inch fraction) of the natural coarse granular soils are shown on Figs. 6 and 7.
Atterberg limits testing indicates the silt and clay soils are of low plasticity. The
laboratory testing is summarized in Table I.
H -P GEOTECH
6 -
No free water was encountered in the pits at the time of excavation and the
subsoils were moist.
GEOLOGIC SITE ASSESSMENT
It should be possible to construct single family residences on the thirteen proposed
lots without encountering unusual problems associated with the site geology if the steeply
sloping areas are avoided. There are several geologic conditions which should be
considered in development planning as discussed below. Geotechnical engineering
recommendations pertaining to foundations, roads, site grading, and on-site sewage
disposal are presented in the Preliminary Design Recommendations section of this report.
LANDSLIDES AND SLOPE INSTABILITY
A landslide complex is located on the escarpment in the southern partso f Lots 7
and 8. This area and the aajacent steep escarpment should be considered high risk areas
for potential slope instability. The steep escarpment is not recommended for home sites or
other construction which could significantly disturb the slopes. It is recommended that
home sites and other construction which requires cuts and fills greater than about 5 feet
deep not be considered on slopes steeper than 30%, unless further studies show that the
construction will not adversely impact the slope stability. A sharp topographic break
occurs between the escarpment and upland at about the contact between = Units
QUTbb and Qc/Tbb. We recommend that structures be set back at from this
topographic break unless further studies show that it is acceptable to builon t e steeper
slopes.
EARTHQUAKES
The project site could experience moderately strong earthquake -related ground
shaking of Modified Mercalli Intensity VI during a reasonable service life for residential
H -P GEOTECH
7
construction, but the probability for stronger ground shaking is low. Intensity VI ground
shaking is felt by most people and can cause general alarm, but results in negligible damage
to structures of good design and construction. All structures on the prouertv should be
designed to withstand moderately strong ground shaking with little or no damage and not
to co lapse under stronger ground shaking. The region is in the Uniform Building Code
Seismic Risk Zone 1. Based on our current understanding of the earthquake hazard in this
part of Colorado, we see no reason to increase the commonly accepted seismic risk zone
for the area.
GYPSUM DEFORMATION
Unusual topographic features were not observed on the property, but linear
topographic escarpments are sometimes present elsewhere on the uplands to the north.
These unusual topographic features may be associated with flowage, expansion and
solution of the gypsum in the underlying Eagle Valley Evaporate since the basalt flows
were extruded about 8 million years ago. It is uncertain if this deformation is still an active
geologic process or if deformation has stopped. To our knowledge, there has not been
problems with gypsum deformation in this area or in other areas underlain by the Eagle
Valley Evaporite in western Colorado. If deformation is still active, it is likely occurring at
very slow rates and should not be a potential hazard to residential development.
PRELIMINARY DESIGN RECOMMENDATIONS
Severe geologic conditions that would restrict construction were not identified in
the proposed building areas.
The conclusions and recommendations presented below are based on the
proposed development, subsurface conditions encountered in the exploratory pits, and
our experience in the area. The recommendations are suitable for planning and
H -P GEOTECH
8
preliminary design but site-specific studies should be conducted for individual lot
development.
FOUNDATIONS
Bearing conditions will vary depending on the specific location of the building
on the property. Based on the nature of the proposed construction spread footings
bearing on the natural subsoils should be suitable at the building sites. We expect the
footings can be sized for an allowable bearing pressure in the range of 2,000 psf to
4,000 psf. Nested boulders and loose matrix soils may need treatment such as enlarging
footings or placing compacted fill or concrete backfill. Foundation walls should be
designed to span local anomalies and to resist lateral earth loadings when acting as
retaining structures. Below grade areas and retaining walls should be protected from
wetting and hydrostatic loading by use of an underdrain system. The footings in non-
heated areas should have a minimum depth of 36 inches for frost protection.
FLOOR SLABS
Slab -on -grade construction should be feasible for bearing on the natural soils.
There could be some post -construction slab movement. To reduce the effects of some
differential movement, floor slabs should be separated from all bearing walls and
columns with expansion joints. Floor slab control joints should be used to reduce
damage due to shrinkage cracking. A minimum 4 inch thick layer of free -draining
gravel should underlie basement level slabs to facilitate drainage.
UNDERDRAIN SYSTEM
Although free water was not encountered in the exploratory pits, it has been our
experience in mountainous areas that local perched groundwater may develop during
times o eavy precipitation or seasonal runoff. An underdrain system should be
provided to protect below grade construction, such as retaining walls, crawl space and
H -P GEOTECH
9
basement areas from wetting and hydrostatic pressure buildup. The drains should
consist of drainpipe surrounded above the invert level with free -draining granular
material. The drain should be placed at each level of excavation and at least 1 foot
below lowest adjacent finish grade and sloped at a minimum 1% to a suitable gravity
outlet.
SITE GRADING
The risk of construction induced slope instability at the site appears low provided
the buildings are located above the steep lower part of the property as planned and cut
and fill depths are limited. Cut depths for the building pads and driveway access should
not exceed about 10 feet. Fills should be limited to about 10 feet deep, especially
where they encroach steep downhill sloping areas. Structural fills should be compacted
to at least 95 % of the maximum standard Proctor density near optimum moisture
content. Prior to fill placement, the subgrade should be carefully prepared by removing
all vegetation and topsoil. The fill should be benched into the portions of the natural
slopes exceeding 20% grade. The on-site soils, excluding oversized rock and topsoil,
should be suitable for use in embankment fills.
Permanent unretained cut and fill slopes should be graded at 2 horizontal to
1 vertical or flatter and protected against erosion by revegetation, rock riprap or other
means.
SURFACE DRAINAGE
The grading plan for the subdivision should consider runoff from uphill slopes
through the project and at individual sites. Water should not be allowed to pond where
it could impact slope stability and foundations. To limit infiltration into the bearing
soils next to buildings, exterior backfill should be well compacted and have a positive
slope away from the building for a distance of 10 feet. Roof downspouts and drains
H -P GEOTECH
10 -
should discharge well beyond the limits of all backfill and landscape irrigation should be
restricted.
PERCOLATION TESTS
Percolation testing was performed in shallow pits adjacent to five of the
exploratory pits as shown on Fig. 1. The percolation test holes were dug and soaked on
November 20, 1995. Percolation tests were performed on November 21, 1995. The
test results are attached on Table II and indicate the area is suitable for conventional
leach field septic systems.
LIMITATIONS
This report has been prepared according to generally accepted geotechnical
engineering principles and practices in this area at this time. We make no other
warranty either expressed or implied. The conclusions and recommendations submitted
in this report are based upon the data obtained from the field reconnaissance, review of
published geologic reports, the exploratory pits located as shown on Fig. 1, the assumed
type of construction and our experience in the area. Our findings include interpolation
and extrapolation of the subsurface conditions identified at the exploratory pits and
variations in the subsurface conditions may not become evident until excavation is
performed. If conditions encountered during construction appear different from those
described in this report, we should be notified so that re-evaluation of the
recommendations may be made.
This report has been prepared for the exclusive use by our client for planning
and preliminary design purposes. We are not responsible for technical interpretations
by others of our information. As the project evolves, we should provide continued
consultation, conduct additional evaluations and review and monitor the implementation
of our recommendations. Significant design changes may require additional analysis or
H -P GEOTECH
modifications to the recommendations presented herein. We recommend on-site
observation of excavations and foundation bearing strata and testing of structural fill by
a representative of the soil engineer.
Respectfully Submitted,
HEPWORTH-PAWLA6aQTECHNICAL, INC.
40.t,Tis)0 R•, ,4,
C, .. X1.0 •
24443
Daniel E. HartiE./2,h9/4c
110 NAL El‘
and by:
e
Ralph G. Mock
Engineering Geologist
Reviewed By: SLP
DEH/kmk
REFERENCES
Kirkham, R. M. and Rogers, W.P., 1981, Earthquake Potential in Colorado - A
Preliminary Evaluation: Colorado Geological Survey Bulletin 43.
Larson, E.E., and Others, 1975, Late Cenozoic Basic Volcanism in Northwestern
Colorado and Its Implications Concerning Tectonism and the Origin of the
Colorado River System, in, Curtis, B.F., Editor, Cenozoic History of the
Southern Rocky Mountains: Geological Society of America Memoir 144.
Tweto, 0., 1978, Geology Map of the Leadville 1°X 2° Quadrangle, Northwestern
Colorado: U.S. Geological Survey Map I-999.
H -P GEOTECH
1
ti
z
I
OF
eW
4
tr
r
1-
OJ
IP8_
s
4
o
0
SUBDIVISION, GARFIELDCOUNTY, COLORADO
H
WJ
as
0
J
4)
a
0
5
10
LEGEND:
N
T
Pit 1 Pit 2
WC. 18.1
00-98
200..68
4-40
200-11
Pl. 15
WC 18.9
DD -92
200..78
Pit 3
WC -19.0
DD --88
TOPSOIL; silt and clay, sandy, organic, stitf, moist, dark brown.
CLAY (CL); sandy, slightly gravelly, stiff, moist, medium to dark brown.
Low plasticity.
SILT (ML); sandy, medium dense, moist, light brown. Calcareous.
Pit 4
CLAY AND SILT (CL -ML); sandy, stiff, moist, brown, slightly calcareous,
low plasticity.
SILT AND GRAVEL (ML -GM); sandy with basalt rock fragments up to small
boulder size, medium dense, moist, light brown. Calcareous.
GRAVEL (GM); sandy, slightly silty to silty, with basalt fragments up to 3
teet in diameter, dense, moist, light brown. Calcareous.
Hand driven liner sample.
Disturbed Bulk Sample.
Practical refusal to backhoe on basalt boulders.
WC -17.2
DO -97
200..88
Pit 5
WC -34.9
00.78
NOTES:
Pit6 Pitz
Iss
46
r'..i
4.46
L2003.
14
L-8
1 PI -NP
WD- 13.7
DO.. 102
Pit 8
1 .4-89
1 -200-9
1. Exploratory pits were excavated on November 20. 1995 with a 4x4 rubber -
tired backhoe.
2. Locations of exploratory pits were determined approximately from features
shown on the site plan provided.
3. Elevations of exploratory pits were not measured and logs of exploratory pits
are drawn to depth.
4. The exploratory pit locations should be considered accurate only to the degree
implied by the method used.
5. The lines between materials shown on the exploratory pit logs represent the
approximate boundaries between material types and transitions may be gradual.
6. No free water was encountered in the pits at the time of excavating.
Fluctuations in water level may occur with time.
7. Laboratory Testing Results:
WC = Water Content (%)
DD = Dry Density (pcf)
4 =Percent retained on No. 4 sieve
200-= Percent passing No. 200 sieve
LL = Liquid Limit (%)
PI = Plasticity Index (%)
NP = Nonplastic
0
5
10
195 524
HEPWORTH-PAWLAK
GEOTECHNICAL, Inc.
Levitt Subdivision LOGS OF EXPLORATORY PITS Fig. 2
0. 0a
0
C/
03
1
L
0.
02U
0
C
0
0) 1
tU
0.
o 2
3
5
Moisture Content = 18 . 1
Dry Unit weignt = 98
Sample of: sandy clay
From: Pit 1 at 2.5 feet
percent
pcf
No Movement
Upon Wetting
0.1
t.0 0
APPLIED PRESSURE — ksf
a)0
Moisture Content = 16.9
Ory Unit weignt = 92
Sample of: sandy clay
From: Pit 2 at 5.5 feet
percent
pc!
H II
No Movement
Upon Wetting
II I I I VIII
HHi
VIII
0.1
1.0
10
APPLIED PRESSURE — ksf
195 524
HEPWORTH-PAWLAK
GEOTECHNICAL, Inc.
SWELL-CONSOLIOAION TEST RESULTS
too
Fig. 3
195 524
Compression % Compression %
0
1
2
0
1
2
4
No Movement
Upon Wetting
Moisture Content = 19 .0 percent
Ory Unit Weignt = 88 pcf
Sample of: sandy silty clay
From: Pit 3 at 4 feet
0.1
10
0
APPLIED PRESSURE — ksf
C
Moisture Content = 17 -2 percent
Ory Unit Weight = 97 pct
Sample of: sandy clay
From: Pit 4 at 5 feet
i
0.1
II
Compression
Upon Wetting
1
I I
1.0 to
APPLIED PRESSURE — ksf
HEPWORTH-PAWLAK
GEOTECHNICAL, Inc.
SWELL -CONSOLIDATION TEST RESULTS 1
100
Fig. 4
Compression % Compression %
0
1
2
0
1
2
3
4
0.1
Moisture Content = 314 .9 percent
Ory Unit Weight : 78 pcf
Sampteof: sandy silt
From: Pit 5 at 4. 5 feet
1.0
10
APPLIED PRESSURE — ksf
Moisture Content = 13.7 percent
Dry Untt Weight = 102 oct
Sample of: sandy clay
From: Pit 7 at 3 feet
GO
i
0.1
111
Compression
Upon Wetting
1 I
1.0 :
0
APPLIED PRESSURE — ksf
HEPWORTH-PAWLAK
GEOTECHNICAL, Inc.
SWELL -CONSOLIDATION TEST RESULTS Fig- 5
10o
195 5214
04
r
No Movement
WettingUpon
I
I
1
0
1
2
3
4
0.1
Moisture Content = 314 .9 percent
Ory Unit Weight : 78 pcf
Sampteof: sandy silt
From: Pit 5 at 4. 5 feet
1.0
10
APPLIED PRESSURE — ksf
Moisture Content = 13.7 percent
Dry Untt Weight = 102 oct
Sample of: sandy clay
From: Pit 7 at 3 feet
GO
i
0.1
111
Compression
Upon Wetting
1 I
1.0 :
0
APPLIED PRESSURE — ksf
HEPWORTH-PAWLAK
GEOTECHNICAL, Inc.
SWELL -CONSOLIDATION TEST RESULTS Fig- 5
10o
195 5214
HYOI1OMETER ANALYSIS
ItUE HEADINGS
In
I HO. 7 Nn trtn S71 Irt i0 ttt •R %_
IS MIN 15 MIN. 60 MIN. 19 MIN. 4 MIN. t U1N. •2110
1 ii
100
SIEVE ANALYSIS
J.S. S I ANUANU SE111ES
CLEAII SUUAIII' UVENINI,S
90
60
70
60
O. SQ
um
30
20
10
001
1
r 5- M1.. /1_
0
10
70
30
n
40 Zt
W
50
7Y
00
rc74
0
m
002
1 T----, tr-TT] TTr i
U 9 .331 U 4 IM .297 4'590 1 19 ?03ft 4. 0 9.52 19.1
DIAMETER OF PARTICLE IN MILLIMETERS
1-
IT 1 2
005 .009
CLAY TO SIL7
GRAVEL 40 % SAND 49 % SILT ANO CLAY 1 1 %
44 •Y 15 %
PLASTICITY INOCX
SAMPLE OF silty sand and gravel FROM Pit 1 at 4 feet through 6 feet
with basalt fragments
SAM/
FINE T MEDIUM 1COAn5Ei
GRAVEL
1 7 1
3n
11)()
38, 1 18.2 127 MI
152
FINE COAN SE
ICO9OLES
LIQUID LIMIT
IYDROMETER ANALYSIS
TIME NEAUINGS
24 1411. 7 Nn.
IS MIN t5 MIN 81) MIN. 19 MIN 4 MtN. t MIN '21011
i90
11.5. I ANI7A11U S1IIIES
inn '50 '10'30 '16
SIEVE ANALYSIS
40 •
I
GLEAU SOUMIE OPENINGS
70
60
5
a. a.
50
zW
219W1.
30
001 .001 _001 .006 .019 .037 .074 .149 .207 590 1.19?. 0 .38 4.18
42
CLAY TO SILT
GRAVEL 45 % SAND 41 % SILT ANO CLAY 14 16
38 % NP %
LIOUID LIMIT
PLASTICITY INDEX
SAMPLE OF silty sand and gravel FROM Pit 6 at 4 feet through 6 feet
DIAMETER OF PARTICLE IN MILLIMETERS
FINE1
SAND
MEDIUM 1COnn5EFINE 1 COARSE1
100
9.53 19.1 38.1 16.2 IT?
15220
GRAVEL 1C008LES
195 524
HEPWOR T H-PAWLAK
GEOTECHNICAL, Inc.
GRADATION TEST RESULTS Fig. 6
HYOROMETER ANALYSIS
21 D0. 7 HO
4S MIN IS MIN.
70
t IME HEADINGS
SIEVE ANALYSIS
U.S. SI ANUAl1U SENSES
GLEAN :i(IUAIII• UVENINI.S
Inn •Sn • 4n '10
N- r,- 1S' r 5-8- 8'
80 MiN. 19 MIN,! MIN. I MIN. '71M1 't0 1 n ,
1 _
I0
F- b
17
za
4
0-
LLr.
4-. q0 R
10
10
0.
1101 002
0.
F . i......-7 — f- ~— k. ----h--, .
T-r-TTTT11 I 1 T'T IITT-7 100
i r 1 i 1 T—
41
1 ul4 .1 9 - 41 .19 7 39 4.16 9.52 19.1 38.1 . 78.2 127 200
uDS .009 .019 UV / 149 M` 12 2.0
452
DIAMETER OF PARTICLE IN MILLIMETERS
1
SAND
GIIAVCI.
CLAY TO SILT FINE ] MEDIUM 1CUA11SE.FINE I COAIISC
GRAVEL 69 Y. SAND 22 % SILT AND CLAY 9 %
PLASTICITY INDZX
SAMPLE OF slightlyt silwith
ty
sandy
fragmentsOM
Pit 8 at 3 feet through 4 feet
grave
LIQUID LIMIT
iC080LES
HYDROMETER ANALYSIS
LIME HEADINGS
SII MIN. 19 MIN 4 MIN t MIN
74 int. 71411.
is MIN 15 MIN
100
90
U.S. 1)1 ANDAIIU SEIUES
700 • 1rx1 •-n .441-10
SIEVE ANALYSIS
in n8 •4
CLEAN SOUANE OPENINGS
1.4-
i
0
10
70
80 111111111M11.1
30
a
40W
t
5n
z
GO Ure
0.
10
10
f-
20
90
10
1 .002 005 .009 019
11 1 1 t
077 .074 .149 .297 500 1.19 2.38 1.78
42 2.0
OIAMETER OF PARTICLE IN MILLIMETERS
CLAY TO SILT
ISANG
1FINE MEDIUM
9.12 19.1 38.1 18.2 127131
CO/VISE' FINE 1 COAnsE
GRAVEL
COBBLES
GRAVEL 16 SAND 11. SILT AND CLAY
LIOUIO LIMIT
PLASTICITY INDEX
FROM
SAMPLE OF
100
195 524
I HEPWORTH-PAWLAK
GEOTECHNICAL, Inc.
GRADATION TEST RESULTS Fig. 7
HEPWORTH-PAWLAK GEOTECHNICAL, INC.
JOB NO. 195 524
TABLE 1
SUMMARY OF LABORATORY TEST RESULTS
SAMPLE LOCATION NATURAL
MOISTURE
CONTENT
1%)
NATURAL GRADATION PERCENT ATTERBERG LIMITS UNCONFINED
COMPRESSIVE
STRENGTH
PSF)
SOIL OR
BEDROCK TYPE
DRY
DENSITY
Poi)
GRAVEL SAND
1961
LIQUID
LIMIT
96)
PLASTIC
INDEX
1%1
BORING DEPTH
feet)
PASSING
NO. 200
SIEVE
58 sandy clay
1 2.5 18.1 98
4 to 6 40 49 11 44 15 silty sand and gravel
with basalt fragments
2 5.5 16.9 92 78 sandy clay
3 4 19.0 88 sandy silty clay
4 5 17.2 97 86 sandy clay
5 4.5 34.9 78 sandy silt
6 4 to 6 45 41 14 38 NP silty sand and gravel
sandy clay
7 3 13.7 102
8 3 to 4 69 22 9 slightly silty sandy gravel
with basalt fragments
HEPWORTH-PAWLAK GEOTECHNICAL, INC.
TABLE II
PERCOLATION TEST RESULTS JOB NO. 195 524
Page 1 of 2
HOLE NO. HOLE DEPTH
INCHES)
LENGTH OF
INTERVAL
MIN)
WATER DEPTH
AT START OF
INTERVAL
INCHES)
WATER DEPTH
AT END OF
INTERVAL
INCHES)
DROP IN
WATER
LEVEL
INCHES)
AVERAGE
PERCOLATION
RATE
MIN./INCH)
P-1 42 15
water added
water added
water added
water added
8 7 Y2 YZ
9 8 1/2 1/2
9 8 Y2 A
9 8 Y2 YZ
9 8 1/2 Y2
8 Y2 8 2
c:i.„-.30
P-2 52 15
water added
water added
water added
water added
10 9 1
10 'Y2 10 72
10 Y4 10 Y4 Y2
11 10 1/2 1/2
11 10 Y2 A
10 Y2 10 Y2
30
P-3 45 15
water added
water added
water added
water added
water added
8 6 Y2 1 Y2
8 6 74 1 Y4
8 7 1
7 4 7 Y4
8 7 y4 1r4
8 7 Y4 3'4
20
HEPWORTH-PAWLAK GEOTECHNICAL, INC.
TABLE II
PERCOLATION TEST RESULTS JOB NO. 195 524
Page 2 of 2
HOLE NO. HOLE DEPTH
INCHES)
LENGTH OF
INTERVAL
MIN)
WATER DEPTH
AT START OF
INTERVAL
INCHES)
WATER DEPTH
AT END OF
INTERVAL
INCHES)
DROP IN
WATER
LEVEL
INCHES)
AVERAGE
PERCOLATION
RATE
MIN./INCH)
P-4 46 15 10 8 Y4 1 A
3
water added 10 1/2 9 Y4 Y4
water added 11 10 1
water added
10 9 A
10 1 10 2
10 9 /
P-5 36 15
water added
water added
water added
water added
8 7 1
30
8 /2 7 /2 1
8 /2 7 3 3'4
8 'h 7 74
7 3/4 7 A 2
8 7 h
NOTE: Percolation test holes were dug and soaked on November 20, 1995. Percolation testing was performed on
November 21, 1995.
33 Four Wheel Drive Road
Carbondale, CO 81623
970.309.5259
carla.ostberg@gmail.com
March 31, 2020 Project No. C1513
Pete Waaraniemi
pete@janckilaconstruction.com
Subsurface Investigation and Onsite Wastewater Treatment System Design
4-Bedroom Residence
Lot 4, Whitecloud Ridge Subdivision
382 Whitecloud Road
Garfield County, Colorado
Pete,
CBO Inc. performed a subsurface investigation and completed an onsite wastewater treatment system
(OWTS) design for the subject residence. The 6.049-acre property is located outside of Carbondale, in
an area where OWTSs are necessary.
Legal Description: Section: 28 Township: 7 Range: 87 Subdivision: WHITECLOUD RIDGE SUB-DIV
Lot: 4
Parcel ID: 2391-283-18-004
SITE CONDITIONS The property is currently undeveloped. A 4-bedroom, single-family residence is proposed.
The residence will be served potable water from a community water system. The water line will enter the
property from the north. The water line will not come within 25-feet of any OWTS component.
The proposed soil treatment area (STA) location has an approximate eight percent slope to the
southwest. The landscape is LL (Linear-Linear). The proposed area covered with native grasses and
sage.
There should be no traffic or staging of material over the future STA site to avoid compaction of soils
prior to construction of the STA.
SUBSURFACE
The subsurface was investigated on March 17, 2020 by digging two soil profile test pit excavations (Test
Pits). A visual and tactile soil analysis was completed by Carla Ostberg at the time of excavation.1
The materials encountered in Test Pit #1 consisted of dark brown topsoil to 1.5-feet, underlain by tan
calcareous clay matrix to a maximum depth explored of 8.0-feet. No bedrock or groundwater was
encountered.
1 Carla Ostberg holds a Certificate of Attendance and Examination from the CPOW Visual and Tactile
Evaluation of Soils Training.
Page 2
The materials encountered in Test Pit #2 consisted of dark brown topsoil to 2.0-feet, underlain by tan
calcareous clay matrix to a maximum depth explored of 8.0-feet. No bedrock or groundwater was
encountered.
A tactile analysis of the soils was taken from Test Pit #1 at 3-feet below grade. Soil structure grade was
moderate. The soil formed a ball and a ribbon less than 1-inch in length before breaking. Soil structure
shape was loose to blocky and consistence was firm. Soil texture was both gritty and smooth.
STA sizing is based on Soil Type 2. A long term acceptance rate (LTAR) of 0.6 gallons per square
foot will be used to design the OWTS.
Test Pit #1
Sieved sample
Page 3
Test Pit #1
Test Pit #2 backfill
Page 4
View of proposed STA
DESIGN SPECIFICATIONS Design Calculations:
Average Design Flow = 75 GPD x 2 people/bedroom x 3 Bedrooms + 75 GPD (4th bedroom) = 525 GPD
LTAR = 0.6 GPD/SF
525 GPD / 0.6 GPD/SF x 1.0 (gravity trenches) x 0.7 (chambers) = 613 SF
The OWTS design is based on 4-bedrooms. An average daily wastewater flow of 525 GPD will be used.
For the purposes of this OWTS design, Benchmark Elevation at finished floor 6976’ 6”’ has been
established as 100’. CBO Inc. should be notified of any discrepancies or problems with grade elevations
of proposed components during installation of the OWTS.
OWTS Component Minimum Elevation
Primary Tank Inlet Invert 93.5’ (6970’) (approx. horizontal distance 30’ / min.
2% fall = min. 30.25” drop)
Distribution Box 90.5’ (6967’) (approx. horizontal distance 36’ / min
1% fall = min. 4.5” drop)
Infiltrative Surface (highest trench) 89.5’ (6967’) (approx. horizontal distance 10’ / min.
1% fall = min. 1.25” drop)
The sewer line exiting the residence must have a double-sweep clean out and a minimum 2% grade to
the septic tank.
The system installation must include a 1250-gallon, two-compartment concrete septic tank with an
effluent filter on the outlet tee. Risers must bring the manhole lids to grade for access. If more than one
riser is added to the septic tank, an extension handle must be installed on the effluent filter.
Effluent will gravity flow to a distribution box. The distribution box must be accessible from grade and
must have flow equalizers, or similar product, installed on each outlet pipe in the distribution box to
assure equal flow to each bed.
The STA will consist four trenches, each with of 13 ‘Quick 4’ Standard Plus Infiltrator® chambers for a
total of 52 chambers and 624 square feet of infiltrative area. There must be at least 4-feet of undisturbed
soil between each trench, although we recommend at least 6-feet. Inspection ports must be installed at
the beginning and end of each trench. Ports may be cut to grade and placed in sprinkler boxes for
access.
Page 5
COMPONENT SPECIFICATIONS
The component manufacturers are typical of applications used by contractors and engineers in this area.
CBO Inc. must approve alternative components prior to installation of the OWTS. Requests must
be submitted, in writing, to our office for approval prior to installation. Component technical data
sheets are available upon request.
COMPONENT MANUFACTURER MODEL NO. COMMENTS
Septic Tank Valley Precast Item # 1250-2CP 1250-gallon, 2-
compartment concrete
septic tank
Tank Risers and Lids Orenco® Double-walled PVC Risers and Lids (24” diameter)
Biotube Effluent Filter Orenco® 4 inch diameter, Full Size Effluent Filter and housing
Distribution Box Valley Precast D-Box 8C Concrete distribution box Flow Equalizers 3049 Equalizer 4 Flow Equalizers
Chambers Infiltrator® 52 ‘Quick 4’ Plus Standard Chambers
The component manufacturers are typical of applications used by contractors and engineers in this area.
Alternatives may be considered or recommended by contacting our office. Construction must be
according to Garfield County On-Site Wastewater Treatment System Regulations, the OWTS Permit
provided by Garfield County Building Department, and this design.
INSTALLATION CONTRACTOR
CBO Inc. expects that the installer be experienced and qualified to perform the scope of work outlined in this
design. The installer must review this design thoroughly and coordinate with our office in advance of
installation. Any additional conditions in this design or county permit must be completed and documented
prior to final approval of the OWTS installation. Communication between the installer and this office is
expected throughout the installation.
INSTALLATION OBSERVATIONS CBO Inc. must view the OWTS during construction. The OWTS observation should be performed before
backfill, after placement of OWTS components. Septic tanks, distribution devices, pumps, dosing
siphons, and other plumbing, as applicable, must also be observed. CBO Inc. should be notified 48 hours
in advance to observe the installation.
In an effort to improve the accuracy of the record drawing, we request that the installer provide a
sketch of the installation, including path of the sewer lines, water line installation (if applicable),
septic tank location, STA location, and measurements from building corners or another fixed
objects on the property. This sketch is most easily provided on Sheet W2.0 of the OWTS Design
Packet. Photographs of the installation and final cover are also requested to supplement our installation
documentation.
Page 6
REVEGETATION REQUIREMENTS
An adequate layer of good quality topsoil capable of supporting revegetation shall be placed over the entire
disturbed area of the OWTS installation. A mixture of native grass seed that has good soil stabilizing
characteristics (but without taproots), provides a maximum transpiration rate, and competes well with
successional species. No trees or shrubs, or any vegetation requiring regular irrigation shall be placed over
the STA. Until vegetation is reestablished, erosion and sediment control measures shall be implemented
and maintained on site. The owner of the OWTS shall be responsible for maintaining proper vegetation
cover.
OPERATION INFORMATION AND MAINTENANCE
The property owner shall be responsible for the operation and maintenance of each OWTS servicing the
property. The property owner is responsible for maintaining service contracts for manufactured units,
alternating STAs, and any other components needing maintenance.
Geo-fabrics or plastics should not be used over the STA. No heavy equipment, machinery, or materials
should be placed on the backfilled STA. Machines with tracks (not wheels) should be used during
construction of the STA for better weight distribution. Livestock should not graze on the STA. Plumbing
fixtures should be checked to ensure that no additional water is being discharged to OWTS. For example, a
running toilet or leaky faucet can discharge hundreds of gallons of water a day and harm a STA.
If an effluent filter or screen has been installed in the OWTS, we recommend this filter or screen be cleaned
annually, or as needed. If the OWTS consists of a pressurized pump system, we recommend the laterals be
flushed annually, or as needed.
The homeowner should pump the septic tank every two years, or as needed gauged by measurement of
solids in the tank. Garbage disposal use should be minimized, and non-biodegradable materials should not
be placed into the OWTS. Grease should not be placed in household drains. Loading from a water softener
should not be discharged into the OWTS. No hazardous wastes should be directed into the OWTS.
Mechanical room drains should not discharge into the OWTS. The OWTS is engineered for domestic waste
only.
ADDITIONAL CONSTRUCTION NOTES If design includes a pump, weep holes must be installed to allow pump lines to drain to minimize risk of
freezing. The pump shall have an audible and visual alarm notification in the event of excessively high
water conditions and shall be connected to a control breaker separate from the high water alarm breaker
and from any other control system circuits. The pump system shall have a switch so the pump can be
manually operated.
Excavation equipment must not drive in excavation of the STA due to the potential to compact soil.
Extensions should be placed on all septic tank components to allow access to them from existing grade.
Backfill over the STA must be uniform and granular with no material greater than minus 3-inch.
LIMITS: The design is based on information submitted. If soil conditions encountered are different from conditions
described in report, CBO Inc. should be notified. All OWTS construction must be according to the county
regulations. Requirements not specified in this report must follow applicable county regulations. The
contractor should have documented and demonstrated knowledge of the requirements and regulations of
the county in which they are working. Licensing of Systems Contractors may be required by county
regulation.
Page 7
Please call with questions.
Sincerely,
CBO Inc.
Carla Ostberg, MPH, REHS
33 Four Wheel Drive Road
Carbondale, CO 81623
970.309.5259
carla.ostberg@gmail.com
March 31, 2020 Project No. C1514
Pete Waaraniemi
pete@janckilaconstruction.com
Subsurface Investigation and Onsite Wastewater Treatment System Design
4-Bedroom Residence
Lot 8, Whitecloud Ridge Subdivision
575 Whitecloud Road
Garfield County, Colorado
Pete,
CBO Inc. performed a subsurface investigation and completed an onsite wastewater treatment system
(OWTS) design for the subject residence. The 9.058-acre property is located outside of Carbondale, in
an area where OWTSs are necessary.
Legal Description: Section: 28 Township: 7 Range: 87 Subdivision: WHITECLOUD RIDGE SUB-DIV
Lot: 8
Parcel ID: 2391-294-18-008
SITE CONDITIONS The property is currently undeveloped. A 4-bedroom, single-family residence is proposed.
The residence will be served potable water from a community water system. The water line will enter the
property from the north. The water line will not come within 25-feet of any OWTS component.
The proposed soil treatment area (STA) location has an approximate five percent slope to the southeast.
The landscape is LL (Linear-Linear) turning Convex farther to the east, beyond the STA. The proposed
area covered with native grasses and sage.
There should be no traffic or staging of material over the future STA site to avoid compaction of soils
prior to construction of the STA.
SUBSURFACE
The subsurface was investigated on March 17, 2020 by digging one soil profile test pit excavation (Test Pit).
Only one test pit was excavated in an effort not to disturb the proposed STA. A visual and tactile soil
analysis was completed by Carla Ostberg at the time of excavation.1
The materials encountered in Test Pit #1 consisted of dark brown topsoil to 2.0-feet, underlain by tan
calcareous clay matrix to a maximum depth explored of 8.0-feet. No bedrock or groundwater was
encountered.
1 Carla Ostberg holds a Certificate of Attendance and Examination from the CPOW Visual and Tactile
Evaluation of Soils Training.
Page 2
A tactile analysis of the soils was taken from Test Pit #1 at 3-feet below grade. Soil structure grade was
moderate. The soil formed a ball and a ribbon less than 1-inch in length before breaking. Soil structure
shape was loose to blocky and consistence was firm. Soil texture was both gritty and smooth.
STA sizing is based on Soil Type 2. A long term acceptance rate (LTAR) of 0.6 gallons per square
foot will be used to design the OWTS.
Test Pit #1
Backfill view of test pit
Page 3
View of proposed STA
DESIGN SPECIFICATIONS Design Calculations:
Average Design Flow = 75 GPD x 2 people/bedroom x 3 Bedrooms + 75 GPD (4th bedroom) = 525 GPD
LTAR = 0.6 GPD/SF
525 GPD / 0.6 GPD/SF x 1.2 (gravity bed) x 0.7 (chambers) = 735 SF
The OWTS design is based on 4-bedrooms. An average daily wastewater flow of 525 GPD will be used.
For the purposes of this OWTS design, Benchmark Elevation at finished floor 6937’ 6” has been
established as 100’. CBO Inc. should be notified of any discrepancies or problems with grade elevations
of proposed components during installation of the OWTS.
OWTS Component Minimum Elevation
Primary Tank Inlet Invert 98.5’ (6936’) (approx. horizontal distance 10’ / min.
2% fall = min. 2.5” drop)
Manifold 96.5’ (6934’) (approx. horizontal distance 46’ / min
1% fall = min. 5.75” drop)
The sewer line exiting the residence must have a double-sweep clean out and a minimum 2% grade to
the septic tank.
The system installation must include a 1250-gallon, two-compartment concrete septic tank with an
effluent filter on the outlet tee. Risers must bring the manhole lids to grade for access. If more than one
riser is added to the septic tank, an extension handle must be installed on the effluent filter.
Effluent will gravity flow to a level manifold connecting 4 rows of 16 ‘Quick 4’ Standard Plus Infiltrator®
chambers for a total of 64 chambers and 768 square feet of infiltrative area. Inspection ports must be
installed each corner of the bed. Ports may be cut to grade and placed in sprinkler boxes for access.
Page 4
COMPONENT SPECIFICATIONS
The component manufacturers are typical of applications used by contractors and engineers in this area.
CBO Inc. must approve alternative components prior to installation of the OWTS. Requests must
be submitted, in writing, to our office for approval prior to installation. Component technical data
sheets are available upon request.
COMPONENT MANUFACTURER MODEL NO. COMMENTS
Septic Tank Valley Precast Item # 1250-2CP 1250-gallon, 2-
compartment concrete
septic tank
Tank Risers and Lids Orenco® Double-walled PVC Risers and Lids (24” diameter)
Biotube Effluent Filter Orenco® 4-inch diameter, Full Size Effluent Filter and housing
Chambers Infiltrator® 64 ‘Quick 4’ Plus Standard Chambers
The component manufacturers are typical of applications used by contractors and engineers in this area.
Alternatives may be considered or recommended by contacting our office. Construction must be
according to Garfield County On-Site Wastewater Treatment System Regulations, the OWTS Permit
provided by Garfield County Building Department, and this design.
INSTALLATION CONTRACTOR
CBO Inc. expects that the installer be experienced and qualified to perform the scope of work outlined in this
design. The installer must review this design thoroughly and coordinate with our office in advance of
installation. Any additional conditions in this design or county permit must be completed and documented
prior to final approval of the OWTS installation. Communication between the installer and this office is
expected throughout the installation.
INSTALLATION OBSERVATIONS CBO Inc. must view the OWTS during construction. The OWTS observation should be performed before
backfill, after placement of OWTS components. Septic tanks, distribution devices, pumps, dosing
siphons, and other plumbing, as applicable, must also be observed. CBO Inc. should be notified 48 hours
in advance to observe the installation.
In an effort to improve the accuracy of the record drawing, we request that the installer provide a
sketch of the installation, including path of the sewer lines, water line installation (if applicable),
septic tank location, STA location, and measurements from building corners or another fixed
objects on the property. This sketch is most easily provided on Sheet W2.0 of the OWTS Design
Packet. Photographs of the installation and final cover are also requested to supplement our installation
documentation.
Page 5
REVEGETATION REQUIREMENTS
An adequate layer of good quality topsoil capable of supporting revegetation shall be placed over the entire
disturbed area of the OWTS installation. A mixture of native grass seed that has good soil stabilizing
characteristics (but without taproots), provides a maximum transpiration rate, and competes well with
successional species. No trees or shrubs, or any vegetation requiring regular irrigation shall be placed over
the STA. Until vegetation is reestablished, erosion and sediment control measures shall be implemented
and maintained on site. The owner of the OWTS shall be responsible for maintaining proper vegetation
cover.
OPERATION INFORMATION AND MAINTENANCE
The property owner shall be responsible for the operation and maintenance of each OWTS servicing the
property. The property owner is responsible for maintaining service contracts for manufactured units,
alternating STAs, and any other components needing maintenance.
Geo-fabrics or plastics should not be used over the STA. No heavy equipment, machinery, or materials
should be placed on the backfilled STA. Machines with tracks (not wheels) should be used during
construction of the STA for better weight distribution. Livestock should not graze on the STA. Plumbing
fixtures should be checked to ensure that no additional water is being discharged to OWTS. For example, a
running toilet or leaky faucet can discharge hundreds of gallons of water a day and harm a STA.
If an effluent filter or screen has been installed in the OWTS, we recommend this filter or screen be cleaned
annually, or as needed. If the OWTS consists of a pressurized pump system, we recommend the laterals be
flushed annually, or as needed.
The homeowner should pump the septic tank every two years, or as needed gauged by measurement of
solids in the tank. Garbage disposal use should be minimized, and non-biodegradable materials should not
be placed into the OWTS. Grease should not be placed in household drains. Loading from a water softener
should not be discharged into the OWTS. No hazardous wastes should be directed into the OWTS.
Mechanical room drains should not discharge into the OWTS. The OWTS is engineered for domestic waste
only.
ADDITIONAL CONSTRUCTION NOTES If design includes a pump, weep holes must be installed to allow pump lines to drain to minimize risk of
freezing. The pump shall have an audible and visual alarm notification in the event of excessively high
water conditions and shall be connected to a control breaker separate from the high water alarm breaker
and from any other control system circuits. The pump system shall have a switch so the pump can be
manually operated.
Excavation equipment must not drive in excavation of the STA due to the potential to compact soil.
Extensions should be placed on all septic tank components to allow access to them from existing grade.
Backfill over the STA must be uniform and granular with no material greater than minus 3-inch.
LIMITS: The design is based on information submitted. If soil conditions encountered are different from conditions
described in report, CBO Inc. should be notified. All OWTS construction must be according to the county
regulations. Requirements not specified in this report must follow applicable county regulations. The
contractor should have documented and demonstrated knowledge of the requirements and regulations of
the county in which they are working. Licensing of Systems Contractors may be required by county
regulation.
Page 6
Please call with questions.
Sincerely,
CBO Inc.
Carla Ostberg, MPH, REHS
108
Attachments to Traffic Analysis
Fussner Minor Subdivision
Project Trip Generation
Estimated Project-Generated Traffic1
ITE Code Eq.
Coef Avg. WeekdayAM Peak HourPM Peak HourTrips
(VPD)
%
Trips Trips %
Trips Trips %
Trips Trips %
Trips Trips
Type Rate Rate Rate
4 DU a=9.43 0.75 0.99 38 26%1 74%3 64%3 36%2
b=
0%0 0 0 0 0
38 1 3 3 2
Notes:
1 Values obtained from Trip Generation, 11th Edition, Institute of Transportation Engineers, September 2021.
2 DU = Dwelling Units, kSF = 1,000 Square Feet
Proposed New Trips
3 Fitted curve equations from ITE Land Uses - Equation Type A is T = a * X + b, Equation Type B is Ln(T) = a * Ln(X) + b, Rate is T = a * X
Multi-Modal Reduction
ITE Trip Generation
Equation3
Average
Weekday
Morning Peak Hour Evening Peak Hour
Inbound Outbound Inbound Outbound
Units 2
Proposed Land Use
#210 - Single-Family Detached
Housing (Rates4)
4 Rates were selected over using equations for low unit counts to avoid overestimation of traffic generated
Location:HARMONY LN N/O WIND RIVER RD
Date Range:11/4/2020 - 11/10/2020
Site Code:01
Time NB SB Total NB SB Total NB SB Total NB SB Total NB SB Total NB SB Total NB SB Total NB SB Total
12:00 AM 0 0 0 ------------------0 0 0
1:00 AM 0 0 0 ------------------0 0 0
2:00 AM 0 0 0 ------------------0 0 0
3:00 AM 0 0 0 ------------------0 0 0
4:00 AM 0 0 0 ------------------0 0 0
5:00 AM 1 0 1 ------------------1 0 1
6:00 AM 0 0 0 ------------------0 0 0
7:00 AM 0 4 4 ------------------0 4 4
8:00 AM 1 1 2 ------------------1 1 2
9:00 AM 1 2 3 ------------------1 2 3
10:00 AM 1 4 5 ------------------1 4 5
11:00 AM 3 0 3 ------------------3 0 3
12:00 PM 5 7 12 ------------------5 7 12
1:00 PM 5 3 8 ------------------5 3 8
2:00 PM 6 7 13 ------------------6 7 13
3:00 PM 4 5 9 ------------------4 5 9
4:00 PM 4 0 4 ------------------4 0 4
5:00 PM 2 0 2 ------------------2 0 2
6:00 PM 4 1 5 ------------------4 1 5
7:00 PM 0 1 1 ------------------0 1 1
8:00 PM 0 4 4 ------------------0 4 4
9:00 PM 0 0 0 ------------------0 0 0
10:00 PM 0 0 0 ------------------0 0 0
11:00 PM 0 0 0 ------------------0 0 0
Total 37 39 76 ------------------37 39 76
Percent 49%51%-------------------49%51%-
1. Mid-week average includes data between Tuesday and Thursday.
Wednesday Thursday Friday
11/5/202011/4/2020 Mid-Week Average11/6/2020
Saturday Sunday Monday Tuesday
11/10/202011/9/202011/8/202011/7/2020
Mark Skaggs:425-250-0777
mark.skaggs@idaxdata.com 1
Location:HARMONY LN N/O WIND RIVER RD
Count Direction:Northbound / Southbound
Date Range:11/4/2020 to 11/4/2020
Site Code:01
Total
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 +Volume
Northbound 1 7 10 11 8 0 0 0 0 0 0 0 0 0 0 0 0 37
Percent 2.7%18.9%27.0%29.7%21.6%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%100%
Southbound 2 3 10 14 6 3 1 0 0 0 0 0 0 0 0 0 0 39
Percent 5.1%7.7%25.6%35.9%15.4%7.7%2.6%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%100%
Total 3 10 20 25 14 3 1 0 0 0 0 0 0 0 0 0 0 76
Percent 3.9%13.2%26.3%32.9%18.4%3.9%1.3%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%100%
Northbound Northbound
50th Percentile (Median)20.0 mph Mean (Average) Speed 19.5 mph
26.4 mph 10 mph Pace 11.1 - 21.1 mph
29.7 mph Percent in Pace 59.5 %
Southbound Southbound
50th Percentile (Median)21.7 mph Mean (Average) Speed 21.8 mph
28.7 mph 10 mph Pace 15.9 - 25.9 mph
32.7 mph Percent in Pace 69.2 %
85th Percentile
95th Percentile
85th Percentile
95th Percentile
Vehicle Speed Report Summary
Study Total
Speed Range (mph)
Total Study Percentile Speed Summary Total Study Speed Statistics
Mark Skaggs:425-250-0777
mark.skaggs@idaxdata.com 1
Location:HARMONY LN N/O WIND RIVER RD
Date Range:11/4/2020 to 11/4/2020
Site Code:01
Northbound
Total
Time 0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 +Volume
12:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:00 AM 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1
6:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 AM 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1
9:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
10:00 AM 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
11:00 AM 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 3
12:00 PM 0 1 1 1 2 0 0 0 0 0 0 0 0 0 0 0 0 5
1:00 PM 0 2 1 2 0 0 0 0 0 0 0 0 0 0 0 0 0 5
2:00 PM 0 1 3 2 0 0 0 0 0 0 0 0 0 0 0 0 0 6
3:00 PM 0 0 0 2 2 0 0 0 0 0 0 0 0 0 0 0 0 4
4:00 PM 1 0 2 0 1 0 0 0 0 0 0 0 0 0 0 0 0 4
5:00 PM 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 2
6:00 PM 0 0 1 1 2 0 0 0 0 0 0 0 0 0 0 0 0 4
7:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 1 7 10 11 8 0 0 0 0 0 0 0 0 0 0 0 0 37
Percent 2.7%18.9%27.0%29.7%21.6%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%
50th Percentile (Median)20.0 mph Mean (Average) Speed 19.5 mph
85th Percentile 26.4 mph 10 mph Pace mph
95th Percentile 29.7 mph Percent in Pace 59.5 %
Speed StatisticsDaily Percentile Speed Summary
Wednesday, November 4, 2020
Speed Range (mph)
11.1 - 21.1
Mark Skaggs:425-250-0777
mark.skaggs@idaxdata.com 2
Location:HARMONY LN N/O WIND RIVER RD
Date Range:11/4/2020 to 11/4/2020
Site Code:01
Southbound
Total
Time 0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 +Volume
12:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:00 AM 0 0 0 2 1 0 1 0 0 0 0 0 0 0 0 0 0 4
8:00 AM 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1
9:00 AM 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 2
10:00 AM 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 4
11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:00 PM 0 1 2 2 1 1 0 0 0 0 0 0 0 0 0 0 0 7
1:00 PM 0 0 0 2 0 1 0 0 0 0 0 0 0 0 0 0 0 3
2:00 PM 1 1 2 1 2 0 0 0 0 0 0 0 0 0 0 0 0 7
3:00 PM 0 0 1 3 1 0 0 0 0 0 0 0 0 0 0 0 0 5
4:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:00 PM 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1
7:00 PM 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 1
8:00 PM 0 0 3 0 1 0 0 0 0 0 0 0 0 0 0 0 0 4
9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 2 3 10 14 6 3 1 0 0 0 0 0 0 0 0 0 0 39
Percent 5.1%7.7%25.6%35.9%15.4%7.7%2.6%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%
50th Percentile (Median)21.7 mph Mean (Average) Speed 21.8 mph
85th Percentile 28.7 mph 10 mph Pace mph
95th Percentile 32.7 mph Percent in Pace 69.23 %
15.9 - 25.9
Wednesday, November 4, 2020
Speed Range (mph)
Daily Percentile Speed Summary Speed Statistics
Mark Skaggs:425-250-0777
mark.skaggs@idaxdata.com 3
Location:HARMONY LN N/O WIND RIVER RD
Date Range:11/4/2020 to 11/4/2020
Site Code:01
Northbound
Total
Time 0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 +Volume
12:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:00 AM 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1
6:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 AM 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1
9:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
10:00 AM 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
11:00 AM 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 3
12:00 PM 0 1 1 1 2 0 0 0 0 0 0 0 0 0 0 0 0 5
1:00 PM 0 2 1 2 0 0 0 0 0 0 0 0 0 0 0 0 0 5
2:00 PM 0 1 3 2 0 0 0 0 0 0 0 0 0 0 0 0 0 6
3:00 PM 0 0 0 2 2 0 0 0 0 0 0 0 0 0 0 0 0 4
4:00 PM 1 0 2 0 1 0 0 0 0 0 0 0 0 0 0 0 0 4
5:00 PM 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 2
6:00 PM 0 0 1 1 2 0 0 0 0 0 0 0 0 0 0 0 0 4
7:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 1 7 10 11 8 0 0 0 0 0 0 0 0 0 0 0 0 37
Percent 2.7%18.9%27.0%29.7%21.6%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%
Note: Average only condsidered on days with 24-hours of data.
50th Percentile (Median)20.0 mph Mean (Average) Speed 19.5 mph
85th Percentile 26.4 mph 10 mph Pace 11.1 - 21.1 mph
95th Percentile 29.7 mph Percent in Pace 59.5 %
Speed Range (mph)
Total Study Average
Total Study Percentile Speed Summary Total Study Speed Statistics
Mark Skaggs:425-250-0777
mark.skaggs@idaxdata.com 4
Location:HARMONY LN N/O WIND RIVER RD
Date Range:11/4/2020 to 11/4/2020
Site Code:01
Southbound
Total
Time 0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 +Volume
12:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:00 AM 0 0 0 2 1 0 1 0 0 0 0 0 0 0 0 0 0 4
8:00 AM 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1
9:00 AM 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 2
10:00 AM 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 4
11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:00 PM 0 1 2 2 1 1 0 0 0 0 0 0 0 0 0 0 0 7
1:00 PM 0 0 0 2 0 1 0 0 0 0 0 0 0 0 0 0 0 3
2:00 PM 1 1 2 1 2 0 0 0 0 0 0 0 0 0 0 0 0 7
3:00 PM 0 0 1 3 1 0 0 0 0 0 0 0 0 0 0 0 0 5
4:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:00 PM 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1
7:00 PM 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 1
8:00 PM 0 0 3 0 1 0 0 0 0 0 0 0 0 0 0 0 0 4
9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 2 3 10 14 6 3 1 0 0 0 0 0 0 0 0 0 0 39
Percent 5.1%7.7%25.6%35.9%15.4%7.7%2.6%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%
Note: Average only condsidered on days with 24-hours of data.
50th Percentile (Median)21.7 mph Mean (Average) Speed 21.8 mph
85th Percentile 28.7 mph 10 mph Pace 15.9 - 25.9 mph
95th Percentile 32.7 mph Percent in Pace 69.2 %
Speed Range (mph)
Total Study Average
Total Study Percentile Speed Summary Total Study Speed Statistics
Mark Skaggs:425-250-0777
mark.skaggs@idaxdata.com 5
Location:
Count Direction:
Date Range:
Site Code:
Total
1 2 3 4 5 6 7 8 9 10 11 12 13 Volume
Northbound 0 14 10 0 13 0 0 0 0 0 0 0 0 37
Percent 0.0%37.8%27.0%0.0%35.1%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%100%
Southbound 0 20 11 0 8 0 0 0 0 0 0 0 0 39
Percent 0.0%51.3%28.2%0.0%20.5%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%100%
Total 0 34 21 0 21 0 0 0 0 0 0 0 0 76
Percent 0.0%44.7%27.6%0.0%27.6%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%100%
FHWA Vehicle Classification
Class 1 - Motorcycles Class 8 - Four or Fewer Axle Single-Trailer Trucks
Class 2 - Passenger Cars Class 9 - Five-Axle Single-Trailer Trucks
Class 3 - Other Two-Axle, Four-Tire Single Unit Vehicles Class 10 - Six or More Axle Single-Trailer Trucks
Class 4 - Buses Class 11 - Five or fewer Axle Multi-Trailer Trucks
Class 5 - Two-Axle, Six-Tire, Single-Unit Trucks Class 12 - Six-Axle Multi-Trailer Trucks
Class 6 - Three-Axle Single-Unit Trucks Class 13 - Seven or More Axle Multi-Trailer Trucks
Class 7 - Four or More Axle Single-Unit Trucks
Vehicle Classification Report Summary
FHWA Vehicle Classification
Study Total
HARMONY LN N/O WIND RIVER RD
Northbound / Southbound
11/4/2020 to 11/4/2020
01
Mark Skaggs:425-250-0777
mark.skaggs@idaxdata.com 1
Location:HARMONY LN N/O WIND RIVER RD
Date Range:11/4/2020 to 11/4/2020
Site Code:01
Northbound
Total
Time 1 2 3 4 5 6 7 8 9 10 11 12 13 Volume
12:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:00 AM 0 0 0 0 1 0 0 0 0 0 0 0 0 1
6:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 AM 0 0 0 0 1 0 0 0 0 0 0 0 0 1
9:00 AM 0 0 0 0 1 0 0 0 0 0 0 0 0 1
10:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 1
11:00 AM 0 2 0 0 1 0 0 0 0 0 0 0 0 3
12:00 PM 0 1 3 0 1 0 0 0 0 0 0 0 0 5
1:00 PM 0 1 0 0 4 0 0 0 0 0 0 0 0 5
2:00 PM 0 1 5 0 0 0 0 0 0 0 0 0 0 6
3:00 PM 0 2 0 0 2 0 0 0 0 0 0 0 0 4
4:00 PM 0 2 1 0 1 0 0 0 0 0 0 0 0 4
5:00 PM 0 1 0 0 1 0 0 0 0 0 0 0 0 2
6:00 PM 0 3 1 0 0 0 0 0 0 0 0 0 0 4
7:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 0 14 10 0 13 0 0 0 0 0 0 0 0 37
Percent 0.0%37.8%27.0%0.0%35.1%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%
Wednesday, November 4, 2020
FHWA Vehicle Classification
Mark Skaggs:425-250-0777
mark.skaggs@idaxdata.com 2
Location:HARMONY LN N/O WIND RIVER RD
Date Range:11/4/2020 to 11/4/2020
Site Code:01
Southbound
Total
Time 1 2 3 4 5 6 7 8 9 10 11 12 13 Volume
12:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:00 AM 0 2 1 0 1 0 0 0 0 0 0 0 0 4
8:00 AM 0 0 0 0 1 0 0 0 0 0 0 0 0 1
9:00 AM 0 2 0 0 0 0 0 0 0 0 0 0 0 2
10:00 AM 0 1 2 0 1 0 0 0 0 0 0 0 0 4
11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:00 PM 0 4 1 0 2 0 0 0 0 0 0 0 0 7
1:00 PM 0 3 0 0 0 0 0 0 0 0 0 0 0 3
2:00 PM 0 1 5 0 1 0 0 0 0 0 0 0 0 7
3:00 PM 0 2 1 0 2 0 0 0 0 0 0 0 0 5
4:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:00 PM 0 1 0 0 0 0 0 0 0 0 0 0 0 1
7:00 PM 0 0 1 0 0 0 0 0 0 0 0 0 0 1
8:00 PM 0 4 0 0 0 0 0 0 0 0 0 0 0 4
9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 0 20 11 0 8 0 0 0 0 0 0 0 0 39
Percent 0.0%51.3%28.2%0.0%20.5%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%
Wednesday, November 4, 2020
FHWA Vehicle Classification
Mark Skaggs:425-250-0777
mark.skaggs@idaxdata.com 3
Location:HARMONY LN N/O WIND RIVER RD
Date Range:11/4/2020 to 11/4/2020
Site Code:01
Total Study Average
Northbound
Total
Time 1 2 3 4 5 6 7 8 9 10 11 12 13 Volume
12:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:00 AM 0 0 0 0 1 0 0 0 0 0 0 0 0 1
6:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 AM 0 0 0 0 1 0 0 0 0 0 0 0 0 1
9:00 AM 0 0 0 0 1 0 0 0 0 0 0 0 0 1
10:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 1
11:00 AM 0 2 0 0 1 0 0 0 0 0 0 0 0 3
12:00 PM 0 1 3 0 1 0 0 0 0 0 0 0 0 5
1:00 PM 0 1 0 0 4 0 0 0 0 0 0 0 0 5
2:00 PM 0 1 5 0 0 0 0 0 0 0 0 0 0 6
3:00 PM 0 2 0 0 2 0 0 0 0 0 0 0 0 4
4:00 PM 0 2 1 0 1 0 0 0 0 0 0 0 0 4
5:00 PM 0 1 0 0 1 0 0 0 0 0 0 0 0 2
6:00 PM 0 3 1 0 0 0 0 0 0 0 0 0 0 4
7:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 0 14 10 0 13 0 0 0 0 0 0 0 0 37
Percent 0.0%37.8%27.0%0.0%35.1%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%
Note: Average only condsidered on days with 24-hours of data.
FHWA Vehicle Classification
Mark Skaggs:425-250-0777
mark.skaggs@idaxdata.com 4
Location:HARMONY LN N/O WIND RIVER RD
Date Range:11/4/2020 to 11/4/2020
Site Code:01
Total Study Average
Southbound
Total
Time 1 2 3 4 5 6 7 8 9 10 11 12 13 Volume
12:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:00 AM 0 2 1 0 1 0 0 0 0 0 0 0 0 4
8:00 AM 0 0 0 0 1 0 0 0 0 0 0 0 0 1
9:00 AM 0 2 0 0 0 0 0 0 0 0 0 0 0 2
10:00 AM 0 1 2 0 1 0 0 0 0 0 0 0 0 4
11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:00 PM 0 4 1 0 2 0 0 0 0 0 0 0 0 7
1:00 PM 0 3 0 0 0 0 0 0 0 0 0 0 0 3
2:00 PM 0 1 5 0 1 0 0 0 0 0 0 0 0 7
3:00 PM 0 2 1 0 2 0 0 0 0 0 0 0 0 5
4:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:00 PM 0 1 0 0 0 0 0 0 0 0 0 0 0 1
7:00 PM 0 0 1 0 0 0 0 0 0 0 0 0 0 1
8:00 PM 0 4 0 0 0 0 0 0 0 0 0 0 0 4
9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 0 20 11 0 8 0 0 0 0 0 0 0 0 39
Percent 0.0%51.3%28.2%0.0%20.5%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%
Note: Average only condsidered on days with 24-hours of data.
FHWA Vehicle Classification
Mark Skaggs:425-250-0777
mark.skaggs@idaxdata.com 5
Location:HARMONY LN N/O WIND RIVER RD
Date Range:11/4/2020 to 11/4/2020
Site Code:01
3-Day (Tuesday - Thursday) Average
Northbound
Total
Time 1 2 3 4 5 6 7 8 9 10 11 12 13 Volume
12:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:00 AM 0 0 0 0 1 0 0 0 0 0 0 0 0 1
6:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 AM 0 0 0 0 1 0 0 0 0 0 0 0 0 1
9:00 AM 0 0 0 0 1 0 0 0 0 0 0 0 0 1
10:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 1
11:00 AM 0 2 0 0 1 0 0 0 0 0 0 0 0 3
12:00 PM 0 1 3 0 1 0 0 0 0 0 0 0 0 5
1:00 PM 0 1 0 0 4 0 0 0 0 0 0 0 0 5
2:00 PM 0 1 5 0 0 0 0 0 0 0 0 0 0 6
3:00 PM 0 2 0 0 2 0 0 0 0 0 0 0 0 4
4:00 PM 0 2 1 0 1 0 0 0 0 0 0 0 0 4
5:00 PM 0 1 0 0 1 0 0 0 0 0 0 0 0 2
6:00 PM 0 3 1 0 0 0 0 0 0 0 0 0 0 4
7:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 0 14 10 0 13 0 0 0 0 0 0 0 0 37
Percent 0.0%37.8%27.0%0.0%35.1%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%
FHWA Vehicle Classification
Mark Skaggs:425-250-0777
mark.skaggs@idaxdata.com 6
Location:HARMONY LN N/O WIND RIVER RD
Date Range:11/4/2020 to 11/4/2020
Site Code:01
3-Day (Tuesday - Thursday) Average
Southbound
Total
Time 1 2 3 4 5 6 7 8 9 10 11 12 13 Volume
12:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:00 AM 0 2 1 0 1 0 0 0 0 0 0 0 0 4
8:00 AM 0 0 0 0 1 0 0 0 0 0 0 0 0 1
9:00 AM 0 2 0 0 0 0 0 0 0 0 0 0 0 2
10:00 AM 0 1 2 0 1 0 0 0 0 0 0 0 0 4
11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:00 PM 0 4 1 0 2 0 0 0 0 0 0 0 0 7
1:00 PM 0 3 0 0 0 0 0 0 0 0 0 0 0 3
2:00 PM 0 1 5 0 1 0 0 0 0 0 0 0 0 7
3:00 PM 0 2 1 0 2 0 0 0 0 0 0 0 0 5
4:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:00 PM 0 1 0 0 0 0 0 0 0 0 0 0 0 1
7:00 PM 0 0 1 0 0 0 0 0 0 0 0 0 0 1
8:00 PM 0 4 0 0 0 0 0 0 0 0 0 0 0 4
9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 0 20 11 0 8 0 0 0 0 0 0 0 0 39
Percent 0.0%51.3%28.2%0.0%20.5%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%
FHWA Vehicle Classification
Mark Skaggs:425-250-0777
mark.skaggs@idaxdata.com 7
Location:HARMONY LN N/O WIND RIVER RD
Date Range:5/21/2021 - 5/27/2021
Site Code:01
Time NB SB Total NB SB Total NB SB Total NB SB Total NB SB Total NB SB Total NB SB Total NB SB Total
12:00 AM 0 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 AM 0 0 0 2 1 3 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 AM 0 0 0 0 0 0 0 0 0 1 1 2 0 0 0 0 0 0 0 0 0 0 0 0
3:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0 0
5:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 1 1 1 2 3 0 1 2
6:00 AM 0 0 0 0 0 0 0 0 0 1 0 1 2 0 2 1 0 1 1 0 1 1 0 1
7:00 AM 2 1 3 1 3 4 0 0 0 2 2 4 3 4 7 2 4 6 2 3 5 2 4 6
8:00 AM 4 3 7 5 0 5 2 0 2 6 4 10 1 1 2 1 4 5 6 3 9 3 3 5
9:00 AM 6 0 6 0 2 2 2 3 5 9 3 12 3 2 5 6 3 9 7 3 10 5 3 8
10:00 AM 6 4 10 7 4 11 4 2 6 2 1 3 0 0 0 6 0 6 2 2 4 3 1 3
11:00 AM 6 3 9 4 5 9 7 2 9 4 3 7 1 2 3 0 2 2 8 3 11 3 2 5
12:00 PM 3 5 8 5 8 13 2 4 6 3 1 4 4 4 8 1 3 4 3 4 7 3 4 6
1:00 PM 6 2 8 6 2 8 2 4 6 2 2 4 3 2 5 5 2 7 1 3 4 3 2 5
2:00 PM 4 1 5 5 2 7 0 1 1 10 3 13 2 4 6 4 4 8 1 2 3 2 3 6
3:00 PM 2 4 6 4 5 9 3 4 7 3 5 8 5 3 8 3 4 7 5 8 13 4 5 9
4:00 PM 2 5 7 1 3 4 2 5 7 8 11 19 5 2 7 5 8 13 2 4 6 4 5 9
5:00 PM 2 4 6 3 4 7 5 2 7 5 3 8 1 3 4 4 6 10 3 7 10 3 5 8
6:00 PM 2 1 3 0 3 3 0 1 1 2 1 3 0 3 3 2 0 2 2 3 5 1 2 3
7:00 PM 1 1 2 4 5 9 0 2 2 0 0 0 1 1 2 2 2 4 1 3 4 1 2 3
8:00 PM 0 3 3 3 0 3 0 1 1 2 3 5 4 3 7 1 2 3 2 0 2 2 2 4
9:00 PM 1 0 1 2 4 6 2 1 3 0 2 2 2 3 5 0 0 0 0 1 1 1 1 2
10:00 PM 0 0 0 0 2 2 1 1 2 0 0 0 0 2 2 1 0 1 1 1 2 1 1 2
11:00 PM 1 0 1 0 1 1 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0
Total 48 37 85 52 54 106 34 33 67 60 45 105 37 41 78 45 45 90 48 52 100 43 46 89
Percent 56%44%-49%51%-51%49%-57%43%-47%53%-50%50%-48%52%-49%51%-
1. Mid-week average includes data between Tuesday and Thursday.
Friday Saturday Sunday
5/22/20215/21/2021 Mid-Week Average5/23/2021
Monday Tuesday Wednesday Thursday
5/27/20215/26/20215/25/20215/24/2021
Mark Skaggs:425-250-0777
mark.skaggs@idaxdata.com 1
Location:HARMONY LN N/O WIND RIVER RD
Count Direction:Northbound / Southbound
Date Range:5/21/2021 to 5/27/2021
Site Code:01
Total
0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 +Volume
Northbound 55 150 89 24 5 1 0 0 0 0 0 0 0 0 0 0 0 324
Percent 17.0%46.3%27.5%7.4%1.5%0.3%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%100%
Southbound 38 130 110 22 6 1 0 0 0 0 0 0 0 0 0 0 0 307
Percent 12.4%42.3%35.8%7.2%2.0%0.3%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%100%
Total 93 280 199 46 11 2 0 0 0 0 0 0 0 0 0 0 0 631
Percent 14.7%44.4%31.5%7.3%1.7%0.3%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%100%
Northbound Northbound
50th Percentile (Median)13.6 mph Mean (Average) Speed 14.0 mph
17.9 mph 10 mph Pace 8.2 - 18.2 mph
21.6 mph Percent in Pace 81.8 %
Southbound Southbound
50th Percentile (Median)14.4 mph Mean (Average) Speed 14.7 mph
18.8 mph 10 mph Pace 9.3 - 19.3 mph
21.2 mph Percent in Pace 79.5 %
85th Percentile
95th Percentile
85th Percentile
95th Percentile
Vehicle Speed Report Summary
Study Total
Speed Range (mph)
Total Study Percentile Speed Summary Total Study Speed Statistics
Mark Skaggs:425-250-0777
mark.skaggs@idaxdata.com 1
Location:HARMONY LN N/O WIND RIVER RD
Date Range:5/21/2021 to 5/27/2021
Site Code:01
Northbound
Total
Time 0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 +Volume
12:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:00 AM 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2
8:00 AM 1 2 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4
9:00 AM 2 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6
10:00 AM 0 3 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6
11:00 AM 0 5 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 6
12:00 PM 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3
1:00 PM 0 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6
2:00 PM 1 1 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 4
3:00 PM 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2
4:00 PM 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2
5:00 PM 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2
6:00 PM 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2
7:00 PM 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
8:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:00 PM 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
10:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:00 PM 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
Total 7 28 10 2 1 0 0 0 0 0 0 0 0 0 0 0 0 48
Percent 14.6%58.3%20.8%4.2%2.1%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%
50th Percentile (Median)12.9 mph Mean (Average) Speed 13.5 mph
85th Percentile 18.0 mph 10 mph Pace mph
95th Percentile 21.3 mph Percent in Pace 85.4 %
Speed StatisticsDaily Percentile Speed Summary
Friday, May 21, 2021
Speed Range (mph)
8.6 - 18.6
Mark Skaggs:425-250-0777
mark.skaggs@idaxdata.com 2
Location:HARMONY LN N/O WIND RIVER RD
Date Range:5/21/2021 to 5/27/2021
Site Code:01
Southbound
Total
Time 0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 +Volume
12:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:00 AM 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
8:00 AM 0 1 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3
9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:00 AM 0 1 2 1 0 0 0 0 0 0 0 0 0 0 0 0 0 4
11:00 AM 0 1 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3
12:00 PM 0 2 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5
1:00 PM 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2
2:00 PM 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
3:00 PM 0 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4
4:00 PM 0 3 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 5
5:00 PM 0 2 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 4
6:00 PM 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
7:00 PM 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
8:00 PM 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3
9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 4 11 19 3 0 0 0 0 0 0 0 0 0 0 0 0 0 37
Percent 10.8%29.7%51.4%8.1%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%
50th Percentile (Median)15.5 mph Mean (Average) Speed 14.9 mph
85th Percentile 18.9 mph 10 mph Pace mph
95th Percentile 23.0 mph Percent in Pace 83.78 %
9.6 - 19.6
Friday, May 21, 2021
Speed Range (mph)
Daily Percentile Speed Summary Speed Statistics
Mark Skaggs:425-250-0777
mark.skaggs@idaxdata.com 3
Location:HARMONY LN N/O WIND RIVER RD
Date Range:5/21/2021 to 5/27/2021
Site Code:01
Northbound
Total
Time 0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 +Volume
12:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 AM 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2
2:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
8:00 AM 0 2 2 1 0 0 0 0 0 0 0 0 0 0 0 0 0 5
9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:00 AM 2 4 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7
11:00 AM 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4
12:00 PM 1 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5
1:00 PM 1 4 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 6
2:00 PM 1 2 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 5
3:00 PM 1 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4
4:00 PM 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
5:00 PM 2 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3
6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:00 PM 2 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4
8:00 PM 2 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3
9:00 PM 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2
10:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 13 27 9 2 1 0 0 0 0 0 0 0 0 0 0 0 0 52
Percent 25.0%51.9%17.3%3.8%1.9%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%
50th Percentile (Median)13.1 mph Mean (Average) Speed 13.1 mph
85th Percentile 16.1 mph 10 mph Pace mph
95th Percentile 22.1 mph Percent in Pace 86.5 %
Saturday, May 22, 2021
Speed Range (mph)
Daily Percentile Speed Summary Speed Statistics
6.4 - 16.4
Mark Skaggs:425-250-0777
mark.skaggs@idaxdata.com 4
Location:HARMONY LN N/O WIND RIVER RD
Date Range:5/21/2021 to 5/27/2021
Site Code:01
Southbound
Total
Time 0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 +Volume
12:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
2:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:00 AM 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3
8:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:00 AM 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 2
10:00 AM 0 3 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4
11:00 AM 1 2 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 5
12:00 PM 5 2 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8
1:00 PM 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2
2:00 PM 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 2
3:00 PM 2 1 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5
4:00 PM 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3
5:00 PM 0 3 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4
6:00 PM 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3
7:00 PM 0 2 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5
8:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:00 PM 1 1 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4
10:00 PM 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2
11:00 PM 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
Total 9 28 14 2 1 0 0 0 0 0 0 0 0 0 0 0 0 54
Percent 16.7%51.9%25.9%3.7%1.9%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%
50th Percentile (Median)13.1 mph Mean (Average) Speed 13.1 mph
85th Percentile 16.4 mph 10 mph Pace mph
95th Percentile 20.4 mph Percent in Pace 85.19 %
Speed Statistics
8.5 - 18.5
Saturday, May 22, 2021
Speed Range (mph)
Daily Percentile Speed Summary
Mark Skaggs:425-250-0777
mark.skaggs@idaxdata.com 5
Location:HARMONY LN N/O WIND RIVER RD
Date Range:5/21/2021 to 5/27/2021
Site Code:01
Northbound
Total
Time 0 - 10 10 - 15 15 - 20 20 - 25 25 - 30 30 - 35 35 - 40 40 - 45 45 - 50 50 - 55 55 - 60 60 - 65 65 - 70 70 - 75 75 - 80 80 - 85 85 +Volume
12:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
1:00 AM 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
2:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 AM 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2
9:00 AM 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2
10:00 AM 1 2 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4
11:00 AM 1 4 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7
12:00 PM 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2
1:00 PM 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2
2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 PM 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 3
4:00 PM 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2
5:00 PM 0 2 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5
6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:00 PM 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2
10:00 PM 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
11:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 3 19 11 1 0 0 0 0 0 0 0 0 0 0 0 0 0 34
Percent 8.8%55.9%32.4%2.9%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%
50th Percentile (Median)13.9 mph Mean (Average) Speed 13.9 mph
85th Percentile 16.7 mph 10 mph Pace mph
95th Percentile 19.9 mph Percent in Pace 94.1 %
Sunday, May 23, 2021
Speed Range (mph)
Daily Percentile Speed Summary Speed Statistics
8.6 - 18.6
Mark Skaggs:425-250-0777
mark.skaggs@idaxdata.com 6