HomeMy WebLinkAbout1.05 Water Supply and Management PlanTPR 176-25
Underground Injection Control Well
Water Supply and Management Plan
CPX Piceance Holdings, LLC
34 S. Wynden Drive, Suite 240
Houston, TX 77056
TPR 176-25 UIC Well
Article 4 Section 203.O. Floodplain Analysis
Water Supply and Management Plan
Administrative Review 1 CPX Piceance Holdings, LLC
Garfield County, Colorado 34 S. Wynden Drive, Suite 240
2022 Houston, TX 77056
BJU N23-496 Central Delivery Point
Article 4 Section 203.M. Water Supply and Management Plan
Water Supply and Management Plan Narrative
The Water Management Plan, Section 4-203(M) of the Garfield County Land Use and
Development Code is not applicable to the proposed site or use. The proposed UIC well will not
require water for personnel or water to be supplied to the site for daily operations. During
conversion of the well and initial operations, the site will be accessed daily. After production
operations are fully established, the site will only be accessed daily and monitored with
telemetry. Due to the minimal presence of personnel onsite, a wastewater use will not be
required onsite. Drinking water will be provided in the form of bottled water. Due to the minimal
presence of personnel onsite, water use will not be required onsite.
Throughout the Tepee Park Ranch operations area, fresh water is utilized for dust mitigation.
CPX will adhere to COGCC standards regarding dust. Fresh water for dust mitigation will not
be obtained from within the site perimeter.