Loading...
HomeMy WebLinkAbout1.05 Water Supply and Management PlanTPR 176-25 Underground Injection Control Well Water Supply and Management Plan CPX Piceance Holdings, LLC 34 S. Wynden Drive, Suite 240 Houston, TX 77056 TPR 176-25 UIC Well Article 4 Section 203.O. Floodplain Analysis Water Supply and Management Plan Administrative Review 1 CPX Piceance Holdings, LLC Garfield County, Colorado 34 S. Wynden Drive, Suite 240 2022 Houston, TX 77056 BJU N23-496 Central Delivery Point Article 4 Section 203.M. Water Supply and Management Plan Water Supply and Management Plan Narrative The Water Management Plan, Section 4-203(M) of the Garfield County Land Use and Development Code is not applicable to the proposed site or use. The proposed UIC well will not require water for personnel or water to be supplied to the site for daily operations. During conversion of the well and initial operations, the site will be accessed daily. After production operations are fully established, the site will only be accessed daily and monitored with telemetry. Due to the minimal presence of personnel onsite, a wastewater use will not be required onsite. Drinking water will be provided in the form of bottled water. Due to the minimal presence of personnel onsite, water use will not be required onsite. Throughout the Tepee Park Ranch operations area, fresh water is utilized for dust mitigation. CPX will adhere to COGCC standards regarding dust. Fresh water for dust mitigation will not be obtained from within the site perimeter.