Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
Search
My WebLink
About
MIPA-04-23-8952 Receipts
1.00 General Application Materials
1.01 Vicinity Map
1.02 Grading And Drainage
1.03 Site Plan
1.04 Landscape Plan
1.05 Reclamation Plan
1.06 Impact Analysis
1.07 Improvements Agreement
1.08 Improvement Agreement Waiver Requests 032923-3
1.09 Floodplain Analysis
1.10 Traffic Study 071121
1.11 Wastewater Distribution
1.12 Wastewater Waiver Requests 032923-2
1.13 Water Distribution Plan
1.14 Water Supply Waiver Requests 032923
1.15 Access and Roadways
1.16 Industrial Uses
1.17 Gravel Extraction
1.18 Enforcement and Waiver
1.19 Standards
1.20 Noise Analysis
1.21 Environmental Impact Analysis
1.22 Geo Hazard Study
1.23 DRMS
1.24 DRMS Appendix GS-1 GALENA RESULTS
1.25 DRMS Appendix I-1 _Soil_Report_North_Hangs
1.26 Baseline Conditions
1.27 Mining Plan
1.28 Cross Sections
1.29 Mining Snapshot
1.30 Reclamation Plan
1.31 Hydrology Calculations
1.32 Hydrology Map
1.33 Ditch Reroute
1.34 SPCC 230216
1.35 SWMP North Hangs 230215
1.36 NTC Letter Response Outline
1.37 NH Wetlands 12.23.20
1.38 Town of Silt Letter
1.39 Bernudy Ditch Relocate Letter
1.40 Fire Marshal Letter
1.41 Fuel Trailer Spec Sheet
1.42 Surface Use Waiver
1.43 Water Augmentation Memo and Ltr
1.44 Dahmer Memo
1.45 North Hangs 231023-C-4 Mining Snapshot with Floodplain Elevations
1.46 North Hangs Ops Pad Detail 092723
1.47 North Hangs-Inflow Outflow Memo
1.48 Reclamation Plan and Concepts
1.49 Reclamation Plan Notes